Dag Hammarskjold Plaza Reconstruction Phase 2: project status and contractor scope review

Dag Hammarskjold Plaza Phase 2 includes a historical plan for pavement, furnishings and tree grates. Check the current package and procurement status.

Guide2 min read

Published

Tower crane above steel reinforcement

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Recorded project status
  2. Pavement, furnishings and tree grates
  3. Check the current procurement documents
  4. Compare the plaza package with the earlier plan

NYC Parks describes phase 2 reconstruction at Dag Hammarskjold Plaza at East 47th Street between 1st and 2nd Avenues, Manhattan. Tracker ID 10600, FMS 846 P-306DAGP, was in procurement in the record last updated November 13, 2026. For a GC, the pursuit decision depends on the actual issued scope and whether a solicitation is available, not the tracker phase alone. NYC Parks tracker record.

Recorded project status

The record reports design 100% complete, procurement 60% complete and construction 0% complete. These are separate phase measures. Project funding is recorded as between $3 million and $5 million; that is a funding band, not a bid price or contract award. Design actually completed October 1, 2024; the original design projection was October 1, 2024. Procurement began April 1, 2026 and its recorded projected completion was April 1, 2027. Source: NYC Parks tracker; see also the dataset and data dictionary.

Pavement, furnishings and tree grates

The City’s April 2023 capital-project detail describes pavement, site furnishings and replacement of broken tree grates for this phase. Compare those historical scope elements against the current issued drawings: which pavement limits and furnishings are included, and which grates are to be replaced? The old description is context, not proof of the final contract scope. April 2023 City project detail.

This is an estimating review question, not a statement that any particular item is required. Obtain the drawings, specifications and addenda before assigning scope or settling a bid/no-bid decision. Use the NYC public bid review to record unanswered questions and the responsible reviewer.

Check the current procurement documents

Search the City's Procurement Navigator using the project name and identifiers, and confirm any match with the issuing agency. The City says public opportunities can be searched without a PASSPort account. Check the current solicitation, status, due date and all addenda directly; the tracker snapshot does not establish an open bid. The NYC public project directory provides context for other named packages.

Compare the plaza package with the earlier plan

Once the team has the project documents, Piper's scope-generation workflow can support a document-based scope review. Compare the resulting scope with the issued documents and subcontractor qualifications; resolve open boundaries before carrying a price. See the construction scope review guide.

Research checked November 15, 2026. This is independent Piper analysis, not an NYC Parks notice or agency affiliation.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.