Franklin Field 2236-05: reconcile prequalification, envelope and MEP trade scope
Use the actual Franklin Field invitation to separate trade eligibility, advertised work and unreviewed controlling bid documents.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
For Franklin Field, begin with the right job number and eligibility record. The Boston Housing Authority invitation for IFB 2236-05 concerns Buildings 7 through 13 at 91 Ames Street in Dorchester. It says only trade contractors prequalified under RFQ 2236-04 may bid. The earlier qualification result is an eligibility input; it is not a substitute for the current invitation and its documents.
The invitation identifies Dietz & Company Architects as designer and Colantonio as construction manager at risk. It advertised a November 20, 2026, 11 a.m. trade opening and, when checked, stated that Addenda 1 and 2 had been released. Verify the deadline and complete addenda list against the exact release before acting. The linked registration form was not submitted and the IFB plans, specifications and addenda were not inspected for this review.
Trade readiness register
| Review area | Invitation identifies | What the estimator must reconcile in the actual set |
|---|---|---|
| Eligibility | 2236-04 prequalified trade contractors only | Bidder and trade on the applicable qualification result; current instructions |
| Envelope | Masonry, waterproofing, roofing | Limits, transitions, openings, penetrations and restoration between packages |
| Interior finishes | Tile, resilient flooring, interior painting | Extent of removal and reinstatement around mechanical work |
| Building services | Fire protection, plumbing, HVAC, electrical | Equipment connections, supports, controls, testing and affected envelope interfaces |
| Bid conditions | PLA assent, BABA, Davis-Bacon and Section 3 provisions listed | Actual contract sections, bid forms and project-specific applicability |
| Document control | Addenda 1 and 2 shown on notice when checked | Complete registered issue set and every addendum acknowledged as instructed |
The ten advertised trades are a coverage starting point, not an allocation of every interface. For example, a roof penetration associated with mechanical work can involve opening, flashing, support and reinstatement. Ask the issued details and specifications which work belongs in each package, then compare proposal exclusions against that baseline. Do the same for electrical connections and interior finishes disturbed by plumbing or HVAC. No equipment quantities, window quantities or occupied phasing are established here.
Review the controlling documents before a carry
Get the registered IFB package, drawings, specifications, bid forms, schedule, qualification result and complete addenda. Record document dates and revisions, then check each trade against the exact documents it received. The notice points to PLA Letter of Assent Section 00 73 50 and BABA Section 00 73 73; it also describes wage and participation provisions. These are leads to the controlling documents, not legal advice or a substitute for reviewing the actual provisions.
Use a scope matrix to assign each interface provisionally, with a source and an open question where the set is unclear. Compare the exclusions in each proposal before choosing a carry. The scope generation guide explains the source trail; addenda management explains how to check the actual issued revision.
Compare proposals against the intended scope
Piper bid leveling compares subcontractor proposals against intended project scope and surfaces exclusions, qualifications and gaps. The team decides whether to seek clarification, add back an omission or carry the risk. That decision depends on the actual 2236-05 set, not on the public notice alone.
Related reading
Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.