Hudson Tunnel Project: Hudson River Tunnel section package 1C contractor scope and package guide
Review the bi-state Hudson River Tunnel 1C award, New Jersey shaft and Manhattan handoffs, and distinguish early activity from tunnel boring for contractors.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
Package 1C of the Hudson Tunnel Project builds the new under-river tunnel section between New Jersey and Manhattan. The Gateway Development Commission's GDC Hudson River Tunnel section describes two approximately 7,250-foot tubes, liner, floor and nine cross-passages, with a Hudson County shaft. This is a bi-state package, not a Manhattan-only project.
Award and actual work stage
GDC's April 27, 2026 GDC package 1C award announced an award to Traylor/Walsh/Skanska JV for the river tunnel work and expected work to start in the coming months. Its project page lists the status as in progress and a November 2026 look-ahead, while retaining older language that construction would begin soon. Those statements support early activity but do not establish the date tunnel boring actually started.
Separate the river tunnel from its neighbors
The package page describes the route from the Hudson County Shaft in New Jersey to the 12th Avenue Shaft in Manhattan. It also describes protection work near Hudson Bergen Light Rail and the Willow Avenue Bridge. Review the Manhattan Tunnel package 1B and Hudson River Ground Stabilization as separate scopes, not as part of one undifferentiated award. GDC Hudson River Tunnel section
Price the handoffs, not just the tunnel length
For each end of the drive, identify the receiving or launch condition, survey and tolerance requirements, liner and floor limits, and acceptance documentation in the issued drawings. Ask how stabilization records and any restrictions are transferred to the boring contractor. In New Jersey, examine shaft, rail and bridge protection requirements against the package-specific sequence.
Request geotechnical information, excavation and support requirements, cross-passage details, access arrangements and current changes. Separate verified contract obligations from assumptions in trade quotations. A program page cannot establish exact temporary works or today's boring progress.
Review the river tunnel documents
Once a real package and its controlling documents are available, use the NYC public bid review to record eligibility, addenda and unresolved qualifications. Piper scope generation is a workflow for reviewing project documents supplied by the contractor. Confirm every scope assignment against the issued documents and trade quotations before carrying it.
The NYC public project directory links related project guides and their recorded stages.
The construction scope review guide offers a method for assigning interfaces from the issued documents.
Compare the Manhattan and cross-river package boundaries so tunnel boring and approach work are not treated as the same contract. See the Manhattan Tunnel Package 1B guide.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow