Hudson Tunnel Project: Manhattan Tunnel package 1B contractor scope and package guide
Review the Manhattan Tunnel 1B award, river bulkhead and casing interfaces, and the documents needed to assess the separately awarded package for contractors.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The Hudson Tunnel Project's Manhattan Tunnel package 1B builds the Manhattan-side segment between the river bulkhead and the Hudson Yards concrete casing east of 12th Avenue. It is distinct from the cross-river tunnel package. The Gateway Development Commission's February 3, 2025 Manhattan Tunnel contract award awarded the work to Frontier-Kemper-Tutor-Perini JV and authorized notice to proceed.
What the award says about the work
The award describes obstruction removal and protection of the bulkhead and sewer lines. GDC's Manhattan Tunnel project page says construction launched in 2025, and its April 2026 Hudson River Tunnel award described the Manhattan Tunnel as under construction. The 2025 award projected substantial completion in 2029; that is a historical forecast, not evidence of current progress or a revised completion date.
Resolve the shaft and casing interfaces
For an estimate or subcontract review, place the shaft, bulkhead, sewer protection and obstruction removal on a single interface register. Record which drawings define each limit, who supplies temporary protection, the condition at handover and which work must be accepted before the next contractor proceeds. Ask for survey controls and the design's allocation of existing-condition risk in the actual contract.
At the casing end, compare physical termination and tolerance requirements with the Hudson Yards casing section 3. At the river end, check the separately awarded Hudson River Tunnel package 1C. The project boundary does not by itself allocate every temporary or permanent detail.
Documents to obtain before carrying an interface
Use the issued geotechnical baseline and investigation documents, utility and protection drawings, staging plan, package limits and current changes if applicable. Compare subcontract exclusions with the prime's obligations, especially removal, protection and reinstatement. Record unanswered conditions as RFIs or qualifications, not as assumed scope. The NYC public project directory locates related public work.
Review the Manhattan tunnel documents
Once a real package and its controlling documents are available, use the NYC public bid review to record eligibility, addenda and unresolved qualifications. Piper scope generation is a workflow for reviewing project documents supplied by the contractor. Confirm every scope assignment against the issued documents and trade quotations before carrying it.
The construction scope review guide offers a method for assigning interfaces from the issued documents.
Compare the Manhattan and cross-river package boundaries so tunnel boring and approach work are not treated as the same contract. See the Hudson River Tunnel Section Package 1C guide.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow