JFK Elementary geothermal: trace the borefield-to-building handoff
Use a handoff register to review the connection between JFK Elementary's geothermal field, building equipment, electrical work, and controls.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
At JFK Elementary, a useful geothermal review follows the connection from the ground loop into the building and through functional testing. Do not assume the drilling package alone delivers a working heating and hot-water system. The estimator needs the issued documents to establish where civil, mechanical, electrical and controls responsibilities actually begin and end.
The City's project page describes closed-loop geothermal heat pumps, electric heat-pump water heaters replacing gas water heaters, and a building management system. Its timeline places initial drilling and geotechnical work in summer 2024, vertical wells in summer 2025, and horizontal trenching, controls, electrical work and indoor integration in summer 2026. Those are owner timeline entries, not proof that each activity was completed or passed commissioning. Use the dated bulletins and the owner’s acceptance records to investigate what was completed and which interfaces remain open; the timeline alone does not settle those questions.
Build a handoff register before assigning packages
This register is proposed estimating analysis, not an allocation established by the public page. Populate it from the actual issued set and assign each open question to a named reviewer.
| Interface | Evidence to obtain | Question for package review |
|---|---|---|
| Vertical drilling to loop | Issued borefield drawings, logs and acceptance records | Where does the field contractor's work end and who accepts it? |
| Horizontal trenching to building | Route, elevations, penetrations and restoration details | Who installs, protects, tests and restores the connecting work? |
| Loop to indoor heat pumps | Mechanical schedules and connection details | Who furnishes and connects each component and coordinates access? |
| Heat-pump water heaters | Plumbing and equipment schedules | Who carries removal, connections and startup of the specified equipment? |
| Electrical upgrade | One-lines, loads and equipment requirements | Who supplies feeders, disconnects and final connections? |
| BMS and functional integration | Controls sequence, points and test procedures | Who programs, witnesses and corrects integrated operation? |
The critical distinction is between a component test and system acceptance. A loop pressure test, for example, may establish a particular field condition if the contract specifies it; it does not by itself establish that controls, heat pumps and hot-water equipment operate together. Ask the design team for the specified sequence and acceptance responsibilities, then make those costs visible in each affected bid.
Resolve the current document basis
Obtain the current drawings, specifications, addenda, testing plan and any accepted prior-phase records the owner makes available. Record a question where the handoff is missing, along with the proposed carry and deadline for direction. Check the actual issued revision rather than treating the public timeline as a contract set.
The handoff is ready for estimate review when the field acceptance record, indoor connection scope and integrated test responsibilities refer to the same issued design. Keep unresolved connections in the source-backed scope record with the responsible designer and package owner; a public construction timeline cannot close them.
Related reading
Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.