Lindemann-Hurley: separate redevelopment from operating-building work
Separate the Lindemann-Hurley redevelopment selection from forecast operating-building projects before assigning scopes or schedules.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The Lindemann-Hurley redevelopment is a developer-selection process, while separately identified building projects appear in the state's capital forecast. A preconstruction team should track them as distinct records until the owner issues documents connecting their scope and responsibilities.
Separate disposition from interim work
The DCAMM redevelopment page describes a July 2026 call for offers, closed September 18, with proposals under review. It seeks a private development partner for housing, a courtyard, upgraded Department of Mental Health residential and clinical facilities, and mixed-use space. The site is in the West End, bounded by Staniford, Cambridge and Merrimac streets. The public description identifies historic preservation and adaptive reuse priorities; it does not establish a chosen developer or final program.
The Commonwealth's June 2026 announcement says approximately 115 existing residential beds must be maintained on-site or nearby, with new DMH facilities in the redevelopment. It anticipates a development partner in 2027 and subsequent design, permitting and financing. This is a continuity requirement and a forecast, not a construction method or approved phase plan.
Use project IDs to prevent accidental scope merging
The following is an estimator's boundary register based on the DCAMM forecast effective October 31, 2026. Forecast dates are subject to change and are not proof of solicitations or awards.
| Record | Published basis | Estimating question |
|---|---|---|
| Redevelopment | Offers under review; mixed-use and care objectives | What scope, preservation limits and operating interfaces appear in the selected program? |
| DCP2143 | Lindemann electrical infrastructure assessment, forecast bid Q4 2026 | Is the assessment separate from later construction and who receives its findings? |
| DCP2702 | Hurley emergency generator replacement, forecast design Q4 2026 and bid/start Q1 2027 | What existing-system interface and schedule appear in issued documents? |
| DCP2717 | Hurley steam heating, forecast design/bid Q1 2027 and start Q2 2027 | Are shutdown and restoration assumptions defined in its own package? |
Separate IDs do not prove that work can proceed independently, either. Request current owner package limits, access and operating constraints, and responsibility for coordinating any overlapping work. Do not import equipment sizes from an earlier study into a current contract without confirmation. For DCP2143, compare the dated study’s equipment description and elevator-power recommendations with the current issued electrical scope before assigning a carry.
Keep the care interface open
For each possible package, record its source, design maturity, anticipated procurement, occupied-space assumptions and next decision owner. Request the approved continuity and phasing documents when available; the public requirement to maintain beds does not identify a relocation sequence. Verify the owner and issued procurement record and trace the controlling revision before assigning a carry.
Related reading
Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.