LN25WTSNB - Design Build for Westchester Square Library: project scope and procurement guide
Westchester Square Library: review the archived design-build notice for a new Bronx branch, its proposed program and unresolved site and procurement details.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
DDC’s LN25WTSNB design-build procurement describes a new 10,000 to 12,000 square foot New York Public Library branch in the Westchester Square neighborhood of the East Bronx. The September 8, 2025 City Record notice calls for adult, teen and children’s areas supporting reading, study, computing, storytelling and community use. City Record: Westchester Square Library design-build
This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.
Westchester Square procurement and site
The notice was archived when checked November 15, 2026 and listed a November 17, 2025 due date. It does not identify an exact new site address. Treat the neighborhood and program as the established public description, not proof of a particular parcel, award, design or construction start.
Sources for this project: City Record: Westchester Square Library design-build.
Site, utilities and library program
The site is the first estimating gate. Obtain the approved parcel, survey, geotechnical information, utility availability, access rights and any demolition or remediation documents before converting the space program into a site cost. An assumed parcel could change foundations, deliveries and connections materially; keep those costs conditional until the project documents identify the site.
Design-build brief and branch transition
Next, test the design-build brief against the library program: assign space planning, accessibility, building systems, technology infrastructure and commissioning to the responsible design and construction packages. Ask how the existing branch transitions and whether interim service is required, without assuming either is part of the contract. The nominal RFQ downloads were unreadable in this research; request the actual issued package and amendments.
Reconcile the project documents before pricing
Use the DDC addenda and scope review to reconcile issued revisions with the estimate. Record the controlling notice and unresolved obligations in the NYC public bid review checklist. The NYC public project directory helps distinguish this package from other agency projects.
Related reading
DDC bid addenda: reconcile scope and estimate before acknowledging the revision
A DDC addendum can change more than a drawing. Trace the revision into trade scopes, quote qualifications, bid forms and the estimate before final approval.

NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.