Logan E2 L1761: keep geothermal testing separate from production scope

Review Logan L1761-C1 test deliverables, capacity assumptions, soil disposal and water treatment without inventing a production loop.

Guide2 min read

Published

Tower crane against an overcast sky

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Establish the historical package boundary
  2. Test and handling evidence checklist
  3. Get the issue set before finalizing the carry

L1761-C1 is an investigation carry: the advertised work is a geothermal test bore intended to determine expected ground-source heat-exchanger capacity, plus associated soil disposal and water treatment. Do not turn that notice into a production geothermal installation quantity. The useful estimating record connects the test deliverable to the assumptions and handling work that support it.

Establish the historical package boundary

The Massport L1761-C1 notice advertised the E2 Lot Geothermal Test Bore with a July 15, 2026 general-bid deadline. The public listing identifies the same package and date. The notice gives a $250,000 estimated project cost, a historical owner estimate rather than a bid or a price for a production system.

The notice states the purpose of the test but does not report a tested capacity, acceptance threshold, bore depth or count, fluid chemistry, waste classification or production-loop quantity. It does not establish that an airport-wide geothermal conversion was awarded.

Test and handling evidence checklist

Use the following as an estimator's review record. It does not prescribe a test standard or disposal method.

RecordQuestion to resolve from issued documentsPricing consequence to investigate
Test scopeWhat locations, bore details, procedures and deliverables are specified?Define the investigation quantity and proposal inclusions
Capacity basisWhat result and assumptions must the report communicate?Identify report and analysis responsibilities without inventing a capacity
SoilWhat disposal basis, quantities and documentation are specified?Separate handling and disposition assumptions from drilling
WaterWhat treatment basis and deliverables are specified?Compare proposal inclusions and stated exclusions
Future systemIs any production design or installation in this issued package?Keep a later system out of the test carry unless documents include it

Record the source and revision for every answer and flag each unresolved item. A bidder's exclusion for treatment, for example, needs a separate review against the issued specification before the proposal is comparable. If a later design uses the test results, retain the report and its assumptions as evidence rather than treating an expected capacity as a measured result.

Get the issue set before finalizing the carry

Request the test specification, site information and applicable handling requirements; the short notice does not establish their details. The Boston project-source guide helps locate the package, while addenda tracking preserves changes to the testing or handling basis.

ShareLinkedInX

Related reading

Guide4 min

Construction addenda management for GC estimators

Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Tower crane above steel reinforcement

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.