Logan L1967: connect restroom, Kidport and chapel interfaces
Separate L1967 restroom, Kidport and chapel interfaces from L1915 notices that share the amenities-program name.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
For L1967, organize the preconstruction review by passenger space and system, then verify package identity before importing any neighboring trade scope. The shared Logan Terminal Amenities Program name is not enough to establish that an L1915 trade notice covers the same physical boundaries as L1967.
What L1967 actually describes
The L1967 CMAR RFQ described renovation of ten high-traffic restroom sets and three Kidport play areas in Terminals A and B. It identified durable materials, accessibility, wayfinding and maintenance layouts, alongside targeted plumbing, lighting and ventilation enhancements, coordinated to minimize operational disruption. It also described modernization of Our Lady of the Airways Chapel's systems, finishes, accessibility and layout within its existing footprint.
The RFQ set an April 2, 2026 qualification deadline for a shortlist and subsequent RFP. It does not establish a CM selection or an award. This is a notice-level review, not a reading of the supplemental package or subsequent RFP.
Link each space to its system decisions
Create one estimator-owned row per identified space as the drawings become available. This sample structure records questions, not owner-issued sequencing:
| Space | Scope interface to investigate | Evidence and decision to record |
|---|---|---|
| Restroom set | Finishes and layout against plumbing, lighting and ventilation | Location, drawing revision, service boundary, access assumption and restoration carry |
| Kidport area | Layout and finishes against circulation and wayfinding | Plan limits, adjacent passenger route, protection and handoff assumptions |
| Chapel | Existing-footprint layout, accessibility, systems and finishes | Room boundaries, system details, proposal inclusions and open interfaces |
Do not infer which restroom closures can overlap from the quantity of sets. Ask for the actual phasing, access and operating constraints and carry the documented assumption until resolved. Assign a responsible reviewer to each unanswered interface so that a finish proposal and a systems proposal do not both omit restoration.
Crosswalk the similar program names
The separate L1915 trade RFQ with an April 30, 2026 response deadline and trade RFQ with a June 11, 2026 response deadline use the same program label but different trade notices. Record project ID, notice date, procurement stage and physical location side by side. Request the controlling package plans before assigning an L1915 trade, duration or budget to L1967. The Boston source guide and revision tracking guide help establish the document trail.
Related reading
Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.