LQCA19WSD - Woodside Library Branch Major Renovation: project scope and procurement guide
Woodside Library renovation: review the archived CM-Build notice, entrance and accessibility work, building systems, historic fabric and site access questions.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
DDC’s LQCA19WSD is a CM-Build major renovation of Woodside Library, 54-22 Skillman Avenue, Queens. The May 20, 2026 City Record describes building-system, circulation and accessibility improvements, including the main entrance, along with hazardous-material abatement, adjacent access agreements and evaluation and potential restoration of historic elements. City Record: Woodside Library major renovation RFQ
This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.
Woodside procurement and preservation scope
The notice was archived when checked November 15, 2026, after its June 12 listed due date. DDC’s March pilot update anticipated an RFQ and is historical context, not evidence of an award or construction start. The public description does not settle the final preservation decisions or scope.
Sources for this project: City Record: Woodside Library major renovation RFQ; DDC CM-Build pilot update; Queens Public Library: participatory budget.
Entrance, abatement and property access
Use an interface register for the main entrance: survey and accessibility design, demolition and abatement, adjacent-property access, new work and restoration. For each activity ask whether access agreements are already in place, what period they cover and which party bears the associated work. A route shown conceptually across an adjacent property is not the same as an executed right of access.
Building systems and library operations
For systems routes through older fabric, request the survey, hazardous-material report and preservation decisions together. Carry only the work supported by issued documents and identify unresolved treatment or access as a qualification. Ask whether library operations and collections remain during construction. The RFQ downloads were unreadable in this research, so no drawings or technical specifications are claimed as reviewed.
Reconcile the project documents before pricing
Use the DDC addenda and scope review to reconcile issued revisions with the estimate. Record the controlling notice and unresolved obligations in the NYC public bid review checklist. The NYC public project directory helps distinguish this package from other agency projects.
Compare the library guides when separating building-system upgrades from a broader renovation; the project name alone does not establish trade limits. See the Macon Library systems upgrade guide.
Related reading
DDC bid addenda: reconcile scope and estimate before acknowledging the revision
A DDC addendum can change more than a drawing. Trace the revision into trade scopes, quote qualifications, bid forms and the estimate before final approval.

NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.