MBTA employee facilities: distinguish crew quarters from storage

The MBTA employee facilities procurement pairs conditioned crew buildings with unconditioned storage at four distinct properties.

Guide2 min read

Published

Tower crane above steel reinforcement

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Read the program and listed trades separately
  2. Apply the same two-building test at each property
  3. Reconcile package coverage by site

The MBTA employee facilities program is one procurement across four properties, but it contains two different building types at each site. A preconstruction estimate should retain a site-by-building matrix so a conditioned crew building's systems are not automatically carried into unconditioned storage.

Read the program and listed trades separately

The MBTA R16CN02 trade RFQ listing identifies Wellington Yard, Orient Heights Yard, Codman Yard and the South Boston Power Complex. It proposes one conditioned single-story crew building and one unconditioned storage building at each location. Crew buildings range from 3,500 to 5,000 square feet each and storage buildings from 1,800 to 4,000 square feet each. These are program ranges, not exact per-site areas. Wellington is in Medford; the program spans more than one municipality.

The listed package-one trades include waterproofing, damp-proofing and caulking, roofing and flashing, metal windows, plumbing and electrical. A trade RFQ list does not define the whole construction scope, and a building at the power complex does not establish a generation upgrade.

Apply the same two-building test at each property

SitePublished building programEstimator's questions
Wellington YardOne conditioned crew and one unconditioned storage buildingObtain individual areas, utilities, access and existing-yard interfaces
Orient Heights YardOne of each building typeIdentify site-specific foundations, connections and operating constraints
Codman YardOne of each building typeConfirm limits and coordination with other yard work
South Boston Power ComplexOne of each building typeIdentify building connections without assuming generation work

The questions are estimating analysis, not owner-issued trade allocations. In the trade matrix, identify the source and revision for foundations, envelope, mechanical, plumbing and electrical at each building. “Unconditioned” is not enough to determine every ventilation, electrical or protection requirement; obtain the actual design rather than inserting crew-building HVAC or assuming no service at all.

Reconcile package coverage by site

Ask whether mobilization, access, utility extensions and testing are included once per location or in individual trade proposals. Preserve the range as an early program assumption until site-specific plans establish quantities. Record each open utility boundary and the person responsible for confirming it. Verify the owner and issued procurement record and trace the controlling revision before converting a program comparison into a carry.

ShareLinkedInX

Related reading

Guide4 min

Construction addenda management for GC estimators

Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Tower crane above steel reinforcement

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow