OMH Brooklyn Children’s Psychiatric Center Replace Air Handling Units and Controls at Buildings 1 and 2: scope and procurement guide
Brooklyn Children’s Psychiatric Center: review the DASNY qualification stage for replacing 11 air-handling units and coordinating controls across two buildings.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
DASNY solicitation 383130 concerns replacement of 11 air-handling units in Buildings 1 and 2 at Brooklyn Children’s Psychiatric Center, 1819 Bergen Street, Brooklyn. The project title also identifies controls. The immediate decision for a GC is whether to qualify a team capable of coordinating the unit replacements, not how to submit a final construction price. DASNY official opportunity: OMH Brooklyn Children’s Psychiatric Center Replace Air Handling Units and Controls at Buildings 1 and 2
This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.
Psychiatric center EOI and reference plans
The November 5, 2026 notice is an expression of interest only, due December 3 at 2 p.m. DASNY will evaluate qualification packages and invite qualified firms to bid. Its posted drawings and specifications are reference material and do not represent 100% construction or bid documents. Final documents are to go to invited firms.
Sources for this project: DASNY official opportunity: OMH Brooklyn Children’s Psychiatric Center Replace Air Handling Units and Controls at Buildings 1 and 2.
Air-handling units and controls interfaces
Use the reference material to map each unit to its building, access and removal route, duct and piping connections, electrical feeds and controls. For each interface, identify the likely trade and the drawing or specification that must confirm the boundary. Ask what temporary service and shutdown windows the final documents require and how controls integration and testing will be divided. These are estimating questions, not requirements established by the notice.
Qualification and final bid documents
The ten-tab EOI requests five years of similar experience, five relevant projects from the last ten years, three sample schedules, safety and team information, potential subcontractors, workload, EMR, bonding and vendor responsibility information. DASNY says it scores tabs 1 through 7. The notice states a project PLA and lists anticipated participation goals, with final EEO and M/WBE goals to be determined with the final bid documents. Confirm receipt as required in the notice.
Turn the issued scope into a trade review
Once the team has the issued documents, use the construction scope review guide to assign inclusions, exclusions and unresolved interfaces. The NYC public bid review checklist helps check notice obligations separately. Compare the named package with the NYC public project directory before reusing assumptions from another job.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.