P-216BVRC - Design Build for Brownsville Recreation Center: project scope and procurement guide
Brownsville Recreation Center replacement: review the design-build scope, new pool and courts, utility demolition and Golden Age Center phasing questions.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
DDC’s P-216BVRC design-build procurement covers replacement of Brownsville Recreation Center at Linden Boulevard and Mother Gaston Boulevard in Brooklyn. The June 2026 City Record describes demolition of the existing recreation and Golden Age centers, utility cutting, capping and abandonment, and a new center of more than 74,000 square feet with an indoor pool and two gym or basketball courts. City Record: Brownsville Recreation Center design-build RFQ
This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.
Brownsville procurement and Golden Age phasing
The RFQ was archived when checked November 15, 2026, with an August 12 due date. A September 2026 DDC community presentation said the Golden Age Center would remain operational at least until 2028 and gave an overall project budget of $191 million. The budget is not a construction award. Neither source establishes the selected team or a firm construction start.
Sources for this project: City Record: Brownsville Recreation Center design-build RFQ; DDC Brownsville community update, September 2026; City Record: earlier Brownsville reconstruction.
Demolition, utilities and continued service
The important reconciliation is between the RFQ’s eventual demolition and the later operating commitment. Map the existing service boundaries, temporary access and utility cutovers against a confirmed phasing plan before pricing demolition. Ask whether utility abandonment can occur independently for each building and who controls the release of the Golden Age Center. Do not assume closure dates or interim service locations.
Pool, courts and design-build scope
For the replacement facility, seek the design criteria for pool systems, the two courts and their shared mechanical and electrical infrastructure. Separate design development, demolition, new construction and commissioning responsibilities in the design-build proposal. The publicly available nominal RFQ downloads were unreadable in this research; verify current procurement documents and amendments before preparing a price.
Reconcile the project documents before pricing
Use the DDC addenda and scope review to reconcile issued revisions with the estimate. Record the controlling notice and unresolved obligations in the NYC public bid review checklist. The NYC public project directory helps distinguish this package from other agency projects.
Related reading
DDC bid addenda: reconcile scope and estimate before acknowledging the revision
A DDC addendum can change more than a drawing. Trace the revision into trade scopes, quote qualifications, bid forms and the estimate before final approval.

NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.