JFK 5 kV Feeders and Duct Banks: Scope and Procurement Forecast
Review JFK 5 kV Feeders and Duct Banks forecast scope, procurement timing and estimating questions before reviewing the issued documents and preparing a bid.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The JFK forecast describes furnishing and installing 5 kV duct banks and feeders with associated manholes along North Boundary Road and North Hangar Road. It also states that newly installed feeders will be tested and commissioned before connection to the source. The key estimate boundary is the complete route from civil duct bank work through the pre-connection electrical tests.
The row uses “via work order” in its title but does not explain how work orders will be released or priced. It does not specify duct counts, feeder lengths, manhole details, source connection scope or test procedures. Treat those as open items rather than assuming a unit-rate arrangement.
Forecast reference and procurement timing
The Port Authority construction forecast workbook lists the following entry:
- JFK - Rehabilitation of 5KV Feeders Via Work Order: reference listed as TBD; 2027 Q3 forecast procurement; published procurement approach PA.
The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a procurement forecast, not a bid deadline or construction start. The Port Authority construction procurements page says forecast information is the public information available until a solicitation becomes active. This independent Piper analysis is not an agency notice or confirmation of an open bid. Research checked November 15, 2026.
JFK 5 kV Feeders and Duct Banks estimating questions
These are questions for the issued documents, not confirmed contract requirements:
- What route, duct configuration, manhole schedule and feeder lengths are in the issued documents?
- Who provides excavation, restoration, cable installation and source connection at each interface?
- What tests and commissioning records are required before connection, and who performs them?
The forecast leaves a material gap: Work-order mechanics, duct and feeder quantities, connection responsibility and test procedures are not stated. Record each open item with its source, a responsible reviewer and the assumed treatment in the estimate. Once drawings and specifications are issued, compare their limits and trade assignments before converting the forecast into a bid carry.
Review the issued package
Start with the current solicitation, drawings, specifications and any referenced reports, then track changes through construction addenda. Use the Airport scope and operational-interface review to connect project interfaces to the estimate. The NYC public project directory provides a route to other named forecasts.
When actual project documents are available, Piper’s scope-generation workflow can be used with documents supplied by the team to prepare scope for review. The estimator remains responsible for resolving gaps and selecting the bid basis.
Related reading
Airport construction phasing: price the operational interfaces before the package
Airport work can depend on closures, controlled access and staged handbacks. Review connecting the safety and phasing plan to scope, schedule and price.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.