JFK Buildings 14 and 269 fire alarm replacement | scope and forecast guide
Review the JFK Buildings 14 and 269 fire alarm forecast, including the proposed master plan, replacement scope and questions for the issued package for GCs.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The forecast describes replacement of facility-wide fire alarm systems for Port Authority-maintained Buildings 14 and 269, including analysis and evaluation of existing systems and development of a master plan with an alternative facility-wide system. JFK144003 in the Port Authority construction forecast.
Forecast reference and status
The Port Authority forecast workbook lists Replacement Of Facility-Wide Fire Alarm Systems-Buildings 14 & 269, reference JFK144003, for 2027 Q3. This is forecast procurement timing, not a bid due date or construction schedule. The forecast identifies the facility as John F. Kennedy International Airport. The agency construction procurement page explains the forecast context; a forecast entry does not establish an active solicitation. Check current agency advertisements and issued documents before a bid decision.
This is independent Piper analysis of the forecast, checked November 15, 2026, not an agency notice. The forecast does not establish an award, construction start or final package boundaries.
Scope boundaries for Buildings 14 and 269
The master plan and the physical replacement appear together in the description. The scope allocation between investigation, design development and installation is therefore a critical estimating boundary, not a reason to assume a finished design is available.
Record each unresolved boundary with its source and trade owner; confirm quantities in the issued documents before pricing.
Questions for the issued documents
The following are estimating questions, not confirmed project requirements:
- Which existing panels, devices and connections are included at each building, and what existing-system information will be issued?
- What analysis and master-plan deliverables are included in the contractor scope, and how are alternatives evaluated?
- What are the intended transition, testing and acceptance boundaries between existing and replacement systems?
Request the solicitation, drawings, specifications, bid form and all addenda when issued. Compare the actual work limits and obligations to trade quotations, then document exclusions and unresolved interfaces before carrying a price. The airport scope and operational-interface review helps structure that review; use the addenda review method if issued documents change. The public project directory provides a route to other named projects.
Reviewing the issued facility documents
Once the team has the actual documents, Piper's scope-generation workflow can be used with documents supplied by the user to help organize scope review. Estimators still need to resolve project-specific boundaries and price the work against the controlling documents.
Check the separate fire-alarm forecast guide before combining building lists or carrying a shared system assumption across references. See the JFK fire-alarm forecast listing Buildings 141 and 209 guide.
Related reading
Airport construction phasing: price the operational interfaces before the package
Airport work can depend on closures, controlled access and staged handbacks. Review connecting the safety and phasing plan to scope, schedule and price.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.