JFK Runway 4R-22L and Taxiway Rehabilitation: Scope and Procurement Forecast
Review JFK Runway 4R-22L and Taxiway Rehabilitation scope, forecast timing and estimating questions before reviewing the issued documents and preparing a bid.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
JFK’s Runway 4R-22L forecast combines rehabilitation of the runway and associated taxiways within the runway safety area with lighting, drainage, markings, signage and taxiway fillet upgrades as required. A precon review should follow those interfaces through the pavement scope rather than carrying a standalone mill-and-overlay price.
The forecast specifies a minimum three-inch mill and overlay, new signage addressing airport certification Part 139 compliance, new markings, resetting or adjustment of lighting and drainage structures, and fillet upgrades as required. It does not specify the final locations, quantities or the applicable design details. The certification reference is a statement of the forecast’s stated purpose, not a substitute for contract requirements.
Forecast reference and procurement timing
The Port Authority construction forecast workbook lists the following entry:
- Rehabilitation of Runway 4R-22L and Associated Taxiways: reference JFK164032; 2027 Q3 forecast procurement; published procurement approach PA.
The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a procurement forecast, not a bid deadline or construction start. The Port Authority construction procurements page says forecast information is the public information available until a solicitation becomes active. This independent Piper analysis is not an agency notice or confirmation of an open bid. Research checked November 15, 2026.
JFK Runway 4R-22L and Taxiway Rehabilitation estimating questions
These are questions for the issued documents, not confirmed contract requirements:
- Where are runway, taxiway and fillet limits, and which surfaces receive each treatment?
- Which lights and drainage structures are reset or adjusted, and how are their interfaces with the new pavement priced?
- What signage, markings, acceptance and operational sequencing do the issued documents actually require?
The forecast leaves a material gap: Work limits, quantities, fillet details and operational sequencing are not stated. Record each open item with its source, a responsible reviewer and the assumed treatment in the estimate. Once drawings and specifications are issued, compare their limits and trade assignments before converting the forecast into a bid carry.
Review the issued package
Start with the current solicitation, drawings, specifications and any referenced reports, then track changes through construction addenda. Use the Airport scope and operational-interface review to connect project interfaces to the estimate. The NYC public project directory provides a route to other named forecasts.
When actual project documents are available, Piper’s scope-generation workflow can be used with documents supplied by the team to prepare scope for review. The estimator remains responsible for resolving gaps and selecting the bid basis.
Related reading
Airport construction phasing: price the operational interfaces before the package
Airport work can depend on closures, controlled access and staged handbacks. Review connecting the safety and phasing plan to scope, schedule and price.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.