JFK Taxiways A and B Southwest: Scope and Procurement Forecast
Review JFK Taxiways A and B Southwest forecast scope, procurement timing and estimating questions before reviewing the issued documents and preparing a bid.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The forecast describes rehabilitation of the southwest portions of Taxiways A and B, including a minimum three-inch asphalt mill and overlay, electrical infrastructure, guidance signs and foundations, drainage casting adjustments and pavement markings. This is independent Piper analysis, not an agency notice. Research checked November 15, 2026.
Forecast scope and procurement timing
The Port Authority construction forecast workbook identifies JFK164043 at John F. Kennedy International Airport. Its entries are:
- Rehabilitation of Taxiways A and B Southwest: 2027 Q1 procurement forecast; published procurement approach: TBD.
The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a forecast of procurement timing, not a bid deadline, construction start or guarantee of release. The Port Authority construction procurement page explains the forecast context and directs readers to advertisements for active solicitations. Confirm current status there; this snapshot does not establish an open bid.
Connect taxiway paving, lighting and drainage
The pavement scope intersects electrical fixtures and cable, sign foundations and drainage castings. The forecast also says the work is to comply with FAA requirements; identify the actual incorporated provisions in the issued package rather than importing a generic list.
Estimating investigation, not confirmed requirements
- What are the southwest work limits and pavement quantities?
- How are in-pavement lights, base cans and AOA lighting cable divided between paving and electrical trades?
- Who carries sign foundations, drainage casting adjustments and final markings?
Record each answer against the drawing, specification, schedule or clarification that establishes it. If the issued documents leave a boundary unclear, identify the affected trade carry and seek clarification through the solicitation process before relying on an exclusion.
Before committing the bid team
Find the current advertisement, solicitation, drawings, specifications and all addenda, if issued. Match the reference and exact title, establish the document baseline, then compare scope assignments with the bid form and trade quotes. Check whether the actual procurement approach and requirements have changed since the forecast. The Airport scope and operational-interface review gives the team a review structure; use the addenda management guide when revisions arrive. The NYC public project directory provides a path to other named packages.
Review the issued scope
Once the team has the relevant project documents, Piper's scope-generation workflow can help organize scope from documents the user supplies. The estimator still needs to check the output against the controlling documents and resolve the open interfaces before carrying a price.
Related reading
Airport construction phasing: price the operational interfaces before the package
Airport work can depend on closures, controlled access and staged handbacks. Review connecting the safety and phasing plan to scope, schedule and price.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.