JFK Runway 13R-31L Interim Rehabilitation: Scope and Procurement Forecast
Review JFK Runway 13R-31L Interim Rehabilitation scope, forecast timing and estimating questions before reviewing the issued documents and preparing a bid.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The forecast calls for partial and full concrete slab replacement, slab-corner reconstruction, spall repairs, joint-seal replacement and replacement of in-pavement lights on Runway 13R-31L. It states the work is to comply with FAA Part 139 requirements for annual airport certification. This is independent Piper analysis, not an agency notice. Research checked November 15, 2026.
Forecast scope and procurement timing
The Port Authority construction forecast workbook identifies JFK164046 at John F. Kennedy International Airport. Its entries are:
- Interim Rehabilitation of Runway 13R-31L: 2027 Q1 procurement forecast; published procurement approach: PA.
The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a forecast of procurement timing, not a bid deadline, construction start or guarantee of release. The Port Authority construction procurement page explains the forecast context and directs readers to advertisements for active solicitations. Confirm current status there; this snapshot does not establish an open bid.
Separate slab repairs from light replacement
The important takeoff split is between full slabs, partial slabs, corners and spalls, with joint seals and lights reconciled to the affected pavement. The forecast does not supply locations or quantities, nor does its reference to Part 139 specify the eventual contract details.
Estimating investigation, not confirmed requirements
- What are the limits and quantities of each repair category?
- How are light fixtures and their interfaces assigned where slabs are replaced?
- Which joint-seal details and acceptance provisions are incorporated in the issued documents?
Record each answer against the drawing, specification, schedule or clarification that establishes it. If the issued documents leave a boundary unclear, identify the affected trade carry and seek clarification through the solicitation process before relying on an exclusion.
Before committing the bid team
Find the current advertisement, solicitation, drawings, specifications and all addenda, if issued. Match the reference and exact title, establish the document baseline, then compare scope assignments with the bid form and trade quotes. Check whether the actual procurement approach and requirements have changed since the forecast. The Airport scope and operational-interface review gives the team a review structure; use the addenda management guide when revisions arrive. The NYC public project directory provides a path to other named packages.
Review the issued scope
Once the team has the relevant project documents, Piper's scope-generation workflow can help organize scope from documents the user supplies. The estimator still needs to check the output against the controlling documents and resolve the open interfaces before carrying a price.
Related reading
Airport construction phasing: price the operational interfaces before the package
Airport work can depend on closures, controlled access and staged handbacks. Review connecting the safety and phasing plan to scope, schedule and price.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.