LaGuardia Buildings 7 and 11 Fleet Chargers: Scope and Procurement Forecast

Review LaGuardia Buildings 7 and 11 Fleet Chargers scope, forecast timing and estimating questions before reviewing the issued documents and preparing a bid.

Guide2 min read

Published

Tower crane above steel reinforcement

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Forecast reference and procurement timing
  2. LaGuardia Buildings 7 and 11 Fleet Chargers estimating questions
  3. Review the issued package

The LaGuardia fleet charger forecast covers Buildings 7 and 11, with at least eight Level 2 ports at each location for light-duty vehicles, as well as Level 3 charging in the overall scope. The Level 3 quantity is not stated. Separate each location’s electrical and site carry before combining a project estimate.

The forecast anticipates breakers, conduits and wiring, charger foundations or pads, possible conduit overhang supports, signs and environmental work such as stormwater protection. These are forecast descriptions, not a final design or a confirmed bill of quantities.

Forecast reference and procurement timing

The Port Authority construction forecast workbook lists the following entry:

  • PA Fleet Charger Installation at Buildings 7 and 11: reference listed as TBD; 2027 Q3 forecast procurement; published procurement approach PA.

The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a procurement forecast, not a bid deadline or construction start. The Port Authority construction procurements page says forecast information is the public information available until a solicitation becomes active. This independent Piper analysis is not an agency notice or confirmation of an open bid. Research checked November 15, 2026.

LaGuardia Buildings 7 and 11 Fleet Chargers estimating questions

These are questions for the issued documents, not confirmed contract requirements:

  • How many Level 2 and Level 3 ports are specified at each building, and who supplies the equipment?
  • What distribution capacity and routes serve each location, including breakers and conduit supports?
  • Which pads, signs, drainage protection and startup tests are assigned at each site?

The forecast leaves a material gap: Level 3 quantities, equipment ratings, routes and final site designs are not stated. Record each open item with its source, a responsible reviewer and the assumed treatment in the estimate. Once drawings and specifications are issued, compare their limits and trade assignments before converting the forecast into a bid carry.

Review the issued package

Start with the current solicitation, drawings, specifications and any referenced reports, then track changes through construction addenda. Use the Airport scope and operational-interface review to connect project interfaces to the estimate. The NYC public project directory provides a route to other named forecasts.

When actual project documents are available, Piper’s scope-generation workflow can be used with documents supplied by the team to prepare scope for review. The estimator remains responsible for resolving gaps and selecting the bid basis.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.