LaGuardia Runway 4-22 Deck Pavement: Scope and Procurement Forecast
Review LaGuardia Runway 4-22 Deck Pavement forecast scope, procurement timing and estimating questions before preparing a bid from the issued documents.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The forecast identifies priority rehabilitation of two asphalt pavement sections on Runway 4-22 Deck, including replacing existing temporary asphalt pavement with concrete. This is independent Piper analysis, not an agency notice. Research checked November 15, 2026.
Forecast scope and procurement timing
The Port Authority construction forecast workbook identifies LGA124880 at LaGuardia Airport. Its entries are:
- Rehabilitation of Pavement on Runway 4-22 Deck: 2026 Q4 procurement forecast; published procurement approach: PA.
The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a forecast of procurement timing, not a bid deadline, construction start or guarantee of release. The Port Authority construction procurement page explains the forecast context and directs readers to advertisements for active solicitations. Confirm current status there; this snapshot does not establish an open bid.
Define asphalt removal and concrete replacement
The estimating boundary is the transition from temporary asphalt to concrete on a deck. The forecast does not establish thicknesses, reinforcement, demolition limits or the condition of the supporting deck; these can change both trade scope and pricing.
Estimating investigation, not confirmed requirements
- Where are the two sections and their limits?
- What demolition, deck preparation and concrete details are shown?
- How are joints and transitions to adjacent pavement treated?
Record each answer against the drawing, specification, schedule or clarification that establishes it. If the issued documents leave a boundary unclear, identify the affected trade carry and seek clarification through the solicitation process before relying on an exclusion.
Before committing the bid team
Find the current advertisement, solicitation, drawings, specifications and all addenda, if issued. Match the reference and exact title, establish the document baseline, then compare scope assignments with the bid form and trade quotes. Check whether the actual procurement approach and requirements have changed since the forecast. The Airport scope and operational-interface review gives the team a review structure; use the addenda management guide when revisions arrive. The NYC public project directory provides a path to other named packages.
Review the issued scope
Once the team has the relevant project documents, Piper's scope-generation workflow can help organize scope from documents the user supplies. The estimator still needs to check the output against the controlling documents and resolve the open interfaces before carrying a price.
Compare the pavement and structural deck workstreams to identify their interfaces; the forecast references describe separate scopes. See the LaGuardia runway deck structural rehabilitation guide.
Related reading
Airport construction phasing: price the operational interfaces before the package
Airport work can depend on closures, controlled access and staged handbacks. Review connecting the safety and phasing plan to scope, schedule and price.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow