Prospect Park Lookout Hill Forest Restoration Phase 1: project status and contractor scope review
Prospect Park Lookout Hill Forest Restoration Phase 1 involves invasive removal and planting. Check mapped limits and follow-up work in the issued scope.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
This project will remove invasive species, seed and install groundcover, and plant shrubs and trees in Prospect Park. The NYC Parks tracker record identifies tracker 10817, FMS 846 P-2PPLHFR, at Lookout Hill in Prospect Park, Brooklyn. The recorded phase is procurement. The dataset row was last updated November 13, 2026 and this research was checked November 15, 2026. The practical decision is whether the issued scope and current procurement documents justify a pursuit, not whether the tracker phase implies a live bid.
Recorded project status
The tracker reports design 100% complete, procurement 85% complete and construction 0% complete. These percentages describe separate phases. Project funding is between $1 million and $3 million, with source listed as Mayoral; this is funding, not a bid price or award.
The row records design start: March 1, 2025; original projected design completion: November 1, 2025; actual design completion: November 1, 2025; procurement start: July 1, 2026; projected procurement completion: July 1, 2027; recorded construction start: December 1, 2026; projected construction completion: December 1, 2029. Projected and adjusted dates are forecasts, not evidence that a milestone occurred. Any construction start shown in a procurement-phase record is a scheduled field, not confirmation that work began. A past forecast is not a current deadline or proof of completion; where it has elapsed, the current schedule is unknown. The dataset and data dictionary provide the context for the tracker fields.
Treatment limits and establishment
Separate invasive-species removal from seeding, groundcover, shrubs and trees in the issued scope. Check the mapped treatment limits and whether establishment or follow-up work is included. The tracker does not state species, quantities or maintenance obligations, so do not assume them from the listed construction duration.
Check the current procurement documents
Use the tracker to identify the project, then obtain the controlling solicitation, drawings, specifications and addenda from the agency. Verify the current status, eligibility and deadlines before assigning bid resources. The tracker does not itself establish an open solicitation or a contractor award. The NYC public bid review helps record those decisions, and the project directory places this guide among other named projects.
Review the restoration scope
With the actual documents in hand, Piper's scope-generation workflow supports a document-based review. See also the construction scope review guide. This is independent Piper analysis, not an NYC Parks notice or affiliation. Research checked November 15, 2026.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.