111 Centre Street energy upgrade: the chiller, airside controls and lighting handoff
Separate equipment, airside controls and lighting when reviewing the 111 Centre Street energy upgrade.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
For 111 Centre Street, the estimating decision is whether the chiller, airside controls, fan and pump drives, building management points and lighting are each covered through functional acceptance. A single energy-upgrade allowance can hide the controls work that makes separate systems operate together.
The May 2026 DDC record describes chiller replacement, variable-frequency drives and motors, economizer and demand-control ventilation controls, added BMS points, LED lighting and automated lighting controls. Its agency data is dated March 16, 2026 and reports construction. This historical status is not an inspection or evidence of actual savings.
Separate equipment from operating logic
The following is an illustrative responsibility review, not an issued commissioning plan.
| System | Physical work to reconcile | Acceptance boundary to clarify |
|---|---|---|
| Chiller | Removal, replacement, piping and electrical connections | Startup, chilled-water operation and interface to air handlers |
| Fans and pumps | Motors, drives, power and controls | Drive setup, commanded operation and feedback |
| Economizers and ventilation | Sensors, devices and connections | Control sequences, sensor response and BMS points |
| BMS | Hardware, network and points | Programming, trend or demonstration requirements |
| Lighting | Fixtures and control devices | Scheduling, programming and functional testing |
The equipment supplier may start its own device while another party programs the sequence linking it to the BMS. Compare proposals for both tasks and identify who witnesses the integrated test. Obtain actual points lists, sequences and test requirements before treating any example as contract scope.
Review a controlled-system handoff
In an illustrative test sheet, trace one ventilation sensor to its controller, the commanded equipment response and the corresponding BMS indication. Record installer, programmer, witness, pass criteria and the document revision that defines the sequence. If the response is not specified, issue a design question; do not invent setpoints for the estimate.
Review outage and access constraints for a courthouse with the owner and issued phasing documents. Separate equipment procurement, temporary operation, controls programming and return-to-service carries so that a missing handoff is visible during bid leveling.
For the broader package review, use the MEP coordination review and the code requirements review.
Related reading
MEP coordination in preconstruction: assign the interfaces before comparing trade prices
MEP coordination can reveal responsibilities beyond one trade’s drawings. Review supports, openings, controls, access, testing and complete package coverage.

Construction code requirements: confirm the applicable basis before assigning scope
A model-code reference is not a project applicability decision. Review connecting adopted requirements, issued design information, trade scope and pricing.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.