Advancing Construction Supply Chain & Procurement 2027: send precon, not only purchasing
Advancing Construction Supply Chain & Procurement 2027 runs Jan. 26–28 in Dallas. Prices before Dec. 18, the long-lead sessions and why precon should attend.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 6 min
- Published
On this page
Advancing Construction Supply Chain & Procurement 2027 runs Jan. 26–28, 2027 at The Highland Dallas, Curio Collection by Hilton, with a workshop day on Tuesday, Jan. 26 and two conference days after it. It is organized by Hanson Wade Group's Advancing Construction division. A contractor's conference-only pass is $2,249 if booked by Dec. 18, 2026.
The title says procurement, and most companies will send their purchasing director. Our view is that the chief estimator or precon director should be in the room too. Read the agenda and nearly every session is about the same move: committing to equipment, manufacturers and trade partners earlier, before design is complete. Earlier than "after award" means during preconstruction. Every decision procurement makes on a 60% set is a decision the estimate has to carry: what was bought, on what basis of design, at what price and with what escalation exposure. If precon is not part of those conversations, the estimate and the purchase orders drift apart.
Facts below come from the organizer's event site, workshop day, day one and day two agendas, registration, venue and about pages, checked Nov. 23, 2026. The event site names the hotel but does not publish its street address, and two agenda slots are marked as reserved sessions with no title yet.
Logistics at a glance
| Item | Detail |
|---|---|
| Workshop day | Tue. Jan. 26, 2027, 9:00 AM–5:30 PM |
| Conference day 1 | Wed. Jan. 27, 2027, 7:00 AM–3:50 PM |
| Conference day 2 | Thu. Jan. 28, 2027, 8:00 AM–3:10 PM |
| Venue | The Highland Dallas, Curio Collection by Hilton, Dallas (street address not listed on the event site) |
| Format | Three workshops, conference sessions, panels, a procurement-leader-only panel and speed networking |
| Hotel block | $199++ a night for Jan. 26–27, cutoff Jan. 5, 2027 |
What it costs
| Pass | Booked by Dec. 18, 2026 | Door price |
|---|---|---|
| Contractor, Full Access (conference and workshop day) | $3,007 | $3,207 |
| Contractor, Conference Only | $2,249 | $2,449 |
| Service provider, Full Access | $4,197 | $4,397 |
| Service provider, Conference Only | $3,199 | $3,399 |
The organizer says registering by Dec. 18 saves $200. Group discounts are 10% for three people, 15% for four and 20% for five or more from one company, booked and paid together. Contractor pricing has a condition: the organizer limits it to construction companies with a publicly available pipeline that do not sell services for pay. Prices are in U.S. dollars, exclude taxes, and bookings are subject to approval.
The sessions worth a precon seat
Times are as the organizer lists them.
Long-lead equipment, Wednesday morning
- Panel: "Securing Critical Equipment Earlier to Reduce Supply Chain Risk & Protect Project Schedules," Wed. Jan. 27, 8:10 AM, with Travis Okel (Gilbane), Justin Lofley (MasTec), Carsten Bernstiel (Kiewit) and Bryce Jensen (Westland).
- Case study: "Integrating Supply Chain Earlier in Preconstruction to Secure Manufacturing Capacity," 8:50 AM, with Timothy Jed, Supply Chain Leader at DPR Construction. This is the session most directly about precon.
- "Collaborating With Manufacturers Earlier to Improve Equipment Selection & Reduce Procurement Risk," 10:50 AM, Justin Lofley of MasTec.
- "Coordinating Design & Procurement Decisions to Increase Commercial Certainty," 11:20 AM, with Assad Tabatabaie and Jeff Seltzer of Shawmut.
- Case study: "Planning Long-Lead Equipment Earlier," 11:50 AM, Jason Banks, National Procurement Director at JE Dunn.
What a precon team should listen for: when switchgear, generators or air handlers are released on an incomplete design, the estimate has to say what basis of design was bought and what happens if the engineer changes it. Ask the speakers how they price a design change after release, who carries storage and insurance between delivery and installation, and how deposits and escalation clauses on a released order show up in the GMP or lump sum. Also ask how they write the installing subcontractor's scope once the equipment is bought: receiving, offloading, setting, startup and warranty handoff are the lines that go missing. Our guide to leveling bids around owner-furnished equipment covers the same boundary from the owner-furnished side, and estimating from design intent covers how to record what an early number assumes.
Direct procurement, Tuesday workshop
Workshop B: "Expanding Direct Procurement to Increase Commercial Control & Reduce Subcontractor Reliance," Tue. Jan. 26, 1:00 PM, with BJ Neafus, Head of Strategic Sourcing at MMR.
Direct purchase changes bid leveling. When the GC buys the material, sub proposals have to be leveled as labor and installation only, and any sub that still includes material, or excludes handling, breaks the comparison. The workshop is worth the extra day if your firm is moving in this direction. The other workshops cover scaling a procurement function (Workshop A, 10:00 AM, Travis Okel of Gilbane) and driving internal adoption (Workshop C, 3:30 PM, Westland Construction).
Trade partners before the scope is complete
"Strengthening Skilled Trade Partnerships to Secure Capacity," Wed. Jan. 27, 1:20 PM, Gregory Garvin, VP of Purchasing at Gilbane. The organizer describes it as securing trade partners before full design scope. That is the bid coverage problem in a tight market: a sub committed early on a partial scope will price the rest later, from a stronger position. Listen for how the speaker defines scope at the commitment point and what is left open. Related: our bid coverage guide.
Volatility and risk, Thursday
- Panel: "Navigating Supply Chain Volatility to Control Costs & Protect Project Delivery," Thu. Jan. 28, 8:50 AM, with speakers from Kiewit, DPR and JE Dunn among others.
- "Navigating FEOC (Foreign Entities of Concern) & Regulatory Constraints," 11:30 AM, Rebecca Corbin of DEPCOM Power. Sourcing restrictions narrow the list of acceptable manufacturers, which affects both price and lead time in the estimate.
- "Aligning Construction & Procurement Teams to Manage Lead Times, Budgets & Project Schedules," 12:00 PM, Jessie Smillie of SD Builders.
- "Mapping Multi-Tier Supply Chains to Expose Upstream Dependencies," 1:30 PM, Kandice Blair of A-C Electric.
- "Stress-Testing Supply Chain Risk Plans to Protect Project Margins & Delivery Schedules," 2:00 PM, Justin Aubuchon, VP of Preconstruction & Estimating at Bond Brothers. He is the only speaker on the agenda with an estimating title, and his session is the closest thing on the program to a contingency conversation. Our guide to contingency and allowances is good preparation.
The day closes at 2:30 PM with an interactive session, "The Procurement Playbook: What Are You Taking Back to the Business?"
Who attends
The organizer describes the audience as general contractors and trade partners, procurement and supply chain leaders, and manufacturers, suppliers and service providers. It lists 100+ attendees, 18+ speakers, 14+ hours of networking and three workshops. That is a small room, which is an advantage: the speakers are procurement and supply chain leaders at large GCs and specialty contractors, and most of them speak more than once, so you will have time to ask a follow-up question.
Practical tips
- Book by Dec. 18, 2026 for the $200 saving, and check that your firm qualifies for contractor pricing before you pay.
- Bring purchasing and precon together if you can. The group discount starts at three people.
- Use the hotel block. $199++ a night for Jan. 26–27, cutoff Jan. 5, 2027, which the organizer says may sell out earlier. Room-block contact details are on the venue page. The organizer warns about third-party callers posing as the hotel.
- Bring a current long-lead list from a live pursuit, with the basis of design for each item. Specific questions get specific answers.
- Check back for the reserved sessions at 9:20 AM on Jan. 27 and 10:00 AM on Jan. 28.
Where Piper fits between procurement and the estimate
Releasing equipment early only works if everyone knows what was released, on which drawings and specification sections, and what the installing trades now do and do not carry. That information usually ends up spread across purchase orders, an estimate and a scope sheet that were written at different times.
Piper is an AI operating system for preconstruction that keeps one evolving understanding of the project, so a decision made in one workflow informs the next. A survey can pull equipment requirements and lead-time-sensitive items from the specifications with each answer linked to its source. Scope generation can write an install-only scope for a package the GC bought directly, and bid leveling compares the proposals against that scope, flagging the sub who still carries material or excludes startup. It can also draft a schedule from the project documents so procurement durations sit next to the work. Procurement and precon still make the commitments. A demo request form is at the bottom of this page.
FAQ
When and where is Advancing Construction Supply Chain & Procurement 2027?
Jan. 26–28, 2027, at The Highland Dallas, Curio Collection by Hilton, in Dallas. Jan. 26 is a workshop day and the conference runs Jan. 27–28, according to the organizer.
How much does it cost?
For contractors, $2,249 for the conference only or $3,007 with the workshop day if booked by Dec. 18, 2026, rising to $2,449 and $3,207 at the door. Service providers pay $3,199 and $4,197. Group discounts start at three people.
Is it relevant to estimators?
Yes, for precon leaders on projects with long-lead equipment. Several sessions cover releasing equipment and securing trade partners before design is complete, and one speaker, from Bond Brothers, holds a preconstruction and estimating title.
Does the event offer continuing education credits?
The organizer's pages do not list any continuing education credits.
Where this fits in Piper
Scope Generation
Turn drawings, specifications, addenda, and company standards into source-backed trade scopes.
Bid Leveling
Compare subcontractor bids against the intended scope so the low number does not hide an expensive gap.
Related reading
Construction conferences for preconstruction teams, December 2026 to April 2027
Ten construction conferences from December 2026 to April 2027, compared for GC estimators and precon leaders by date, city, cost and who on the team should go.

Leveling bids when the owner buys the equipment
On an OFCI data center, an electrical bid prices custody steps, not gear. How to level each owner-furnished item from receiving to integrated testing.

Design intent is what estimators price when the drawings stop talking
Review implied assemblies and ambiguous interfaces, document the source and decision owner, and keep assumptions visible even when the drawing set appears complete.

Construction contingency vs. allowance: name the uncertainty before carrying it
Allowances and contingency address different estimating questions. A GC review for separating undefined selections, identified risks and missing trade coverage.

On a data center, the schedule is part of the estimate
On a data center one procurement date drives escalation, storage, general conditions and damages. Why precon should price schedule and cost as one risk.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.