AGC Annual Convention 2027 in Phoenix: a guide for precon leaders

AGC's 2027 Annual Convention and Contractor Solutions Expo runs April 6–8 in Phoenix. Registration, hotel and how a precon leader should use the days.

Guide4 min read

Published

Tower crane against an overcast sky

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. The three days at a glance
  2. Registration
  3. What precon leaders can get from it
  4. Practical tips
  5. Where Piper fits for the precon leader

The Associated General Contractors of America's 2027 Annual Convention and Contractor Solutions Expo runs Tuesday, April 6 to Thursday, April 8, 2027, at the Phoenix Convention Center, with pre-conference meetings and events on April 4–5. Registration is open. AGC lists primary registration for members from $1,245 at the early rate.

It is the national association's main yearly gathering: owners and senior executives of contracting firms, operations and project leaders, chapter staff and an exhibit floor. For a preconstruction leader, the honest pitch is this: you will not learn estimating method here. You go to see how peer firms are organizing precon, technology and workforce decisions, to walk an expo aimed at contractor buyers, and to sit in the Building Contractors division meeting with people facing the same market.

Facts below come from the official AGC convention site, its agenda, registration, FAQ, expo and travel pages, checked Nov. 23, 2026. The detailed breakout list was not yet published.

The three days at a glance

DayWhat is scheduled
Sun.–Mon. April 4–5Pre-conference meetings, safety awards judging, chapter events, a volunteer event on April 5; the AGC Education and Research Foundation gala is listed for April 5 in the FAQ
Tue. April 6Division meetings in the morning (Building Contractors 10:00–11:15 AM); Opening General Session 1:30–3:00 PM; first breakouts 3:30 PM; expo 3:00–6:00 PM with welcome reception 4:30–6:00 PM
Wed. April 7Breakouts from 9:00 AM; plenary and AGC Innovation Awards 11:00 AM–12:00 PM; expo 8:00 AM–5:30 PM
Thu. April 8Breakouts from 9:00 AM; legislative and regulatory panel 10:30–11:30 AM; closing plenary 1:00–2:00 PM; expo 8:00 AM–1:00 PM; officer installation reception and dinner in the evening

Keynotes listed by AGC: Justin Wren opens the convention on Tuesday alongside the AGC Culture of CARE Awards, and Col. Nicole Malachowski, USAF (Ret.), closes it on Thursday. Wednesday's plenary features a construction technology founder alongside the Innovation Awards. Thursday's legislative and regulatory panel brings AGC CEO Jeff Shoaf and the association's legislative team.

Registration

AGC's register page shows two price tables with different tier dates, so treat the figures below as the organizer's listed prices and confirm the rate when you check out.

Registration typeEarly (before Nov. 30)StandardLateOnsite
Member, primary$1,245$1,400$1,565$1,650
Non-member, primary$1,565$1,725$1,890$1,950

Those figures come from the table that includes the early tier. The page does not print the year for the Nov. 30 early deadline. AGC also lists a group rate for five or more registrants from member firms, plus discounted rates for chapter staff, students, educators and guests. Primary registration includes all education sessions, the expo, the Celebrate Construction party and the officer installation reception and dinner. Award breakfasts, the prayer breakfast, the foundation gala and professional coaching are ticketed separately.

AGC's FAQ and travel page still say registration opens in the fall. The live register page supersedes that text.

What precon leaders can get from it

Division meetings. The Building Contractors division meets Tuesday morning. Federal and Heavy, Highway and Transportation, and Utility Infrastructure divisions also meet. These are the sessions where members discuss the issues their segment faces, and they are the most direct peer exchange on the program.

Breakouts. AGC had not posted 2027 breakout titles when we checked. Its agenda filters sessions by level (Foundations, Operational Leadership, Project Execution), and its sponsor materials describe past topics including economic outlook, technology and AI, jobsite productivity, workforce, and risk and surety. Check the agenda page closer to April for preconstruction-specific sessions.

The expo. AGC's FAQ describes more than 100 exhibitors, and the organizer describes the expo audience as including executives from ENR Top 400 contractors. For a precon leader evaluating software, the expo is a chance to see several products in one afternoon. Go with your own test: bring a recent bid package and the questions your team actually asks of it. Our guide to evaluating AI preconstruction software lays out what to check beyond the demo.

Peers. Most of the value at an association convention happens between sessions. Precon leaders at peer firms are the best source on how others staff and structure the work. Our pieces on chief estimator versus preconstruction manager roles and where precon teams spend their time are useful framing for those conversations.

Practical tips

  • Hotel: the official hotel is the Sheraton Phoenix Downtown, 340 N. Third Street, about a five-minute walk from the convention center. AGC lists a rate of $319 a night plus taxes, a booking cutoff of Friday, March 12, 2027, and a 72-hour individual cancellation policy. The booking link arrives in your registration confirmation email.
  • Airport: AGC notes Phoenix Sky Harbor is about 3.8 miles away and the hotels do not run airport shuttles.
  • App: the AGC Connect app carries presentations, Wi-Fi details and opt-in attendee networking. AGC does not share an attendee list.
  • Dress: business casual, per AGC's FAQ.
  • Plan the expo time: the floor is open Tuesday afternoon, all day Wednesday and Thursday morning. Wednesday is the easiest day to walk it without missing plenaries.

Where Piper fits for the precon leader

At a convention like this one, technology conversations tend to drift toward tools that each solve one slice of the work. The harder question for a precon leader is how the team's knowledge of a project (scope boundaries, sub history, what changed in the last addendum) carries from one decision to the next.

Piper is an AI operating system for preconstruction built around that question. It keeps one evolving understanding of each project and of the company's own standards, and applies it across scope generation, bid leveling, final bid review and surveys of the project documents. It also does quantity takeoff on drawings and can draft a schedule from the project documents. Findings stay linked to their source and the estimator stays responsible for the commitment. If you would rather see it before April, the demo request is at the bottom of this page.

FAQ

When and where is the 2027 AGC Annual Convention?

April 6–8, 2027, at the Phoenix Convention Center, with pre-conference meetings and events on April 4–5, according to AGC.

How much does AGC Convention 2027 registration cost?

AGC's register page lists primary member registration at $1,245 early (before Nov. 30), $1,400 standard, $1,565 late and $1,650 onsite, and non-member rates from $1,565 to $1,950. The page carries two tables with different tier dates, so confirm the rate at checkout.

What is the official hotel?

The Sheraton Phoenix Downtown, at a listed rate of $319 a night plus taxes, with a booking cutoff of March 12, 2027.

Are there estimating or preconstruction sessions?

AGC had not published its 2027 breakout titles when checked on Nov. 23, 2026. Check the convention agenda page for updates.

ShareLinkedInX

Where this fits in Piper

Related reading

Guide7 min

How to evaluate AI preconstruction software

Test AI preconstruction software on representative documents, company standards and revisions. Inspect findings, source accuracy and the effect of an addendum on prior work.

Tower crane above steel reinforcement

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.