AI & Data Transformation in Construction Summit Austin 2027: go with three questions about evidence

AMG World's AI and data summit is Jan. 26, 2027 in Austin, venue not yet announced. Prices, sessions and three questions to put to every AI claim.

Guide6 min read

Published

Tower crane against an overcast sky

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Logistics at a glance
  2. What it costs
  3. Sessions with a precon angle
  4. Morning
  5. 10:45–11:45 AM tracks
  6. Afternoon
  7. How to judge an AI claim from the audience
  8. Who attends
  9. Practical tips
  10. Where Piper fits against those three questions

AMG World's AI & Data Transformation in Construction Summit runs Tuesday, Jan. 26, 2027, in Austin, Texas, from 7:00 AM registration to a 5:30 PM close, followed by a drinks reception. The organizer had not announced a venue when we checked. Passes for contractor and other AEC organizations are $995 through Dec. 18, 2026.

This is a data and technology summit. The organizer pitches it to leaders in data science, AI, IT, enterprise architecture, digital transformation and operations, and the speaker list is mostly AI, data and VDC managers at general contractors. Estimating and preconstruction are not on the list of target roles, and only one listed speaker holds a preconstruction title.

So who from precon should go? Our position: only the precon leader who will be part of deciding which AI the estimating team uses, and only if they go to test claims rather than collect them. Everyone else in precon is better served by having the firm's technology lead attend and come back with answers to three specific questions, set out below. That is a narrower recommendation than the program invites, and we think it is the right one.

Facts below come from the organizer's summit page, agenda, speakers, registration and venue pages, checked Nov. 23, 2026. The same page also carries material from the January 2026 edition; everything here is from the 2027 listing. The agenda page interleaves session titles and speaker names, so some early-morning attributions below are the organizer's adjacent listing, not a confirmed pairing.

Logistics at a glance

ItemDetail
DateTuesday, Jan. 26, 2027
TimesRegistration 7:00 AM; opening remarks 7:45 AM; close 5:30 PM; drinks reception 5:35–6:35 PM
CityAustin, Texas
VenueNot yet announced by the organizer
FormatOne day: keynotes, four parallel tracks, panels, technology demonstrations, exhibition
IncludedSessions, lunch, refreshments, drinks reception and presentation downloads after the event
CreditsNone listed

What it costs

PassThrough Dec. 18, 2026After Dec. 18, 2026
AEC organizations (contractors, owners, designers)$995$1,195
Technology and solution providers$1,795$1,895

Earlier AEC tiers of $595 (to Oct. 9) and $795 (to Nov. 20) have passed. The organizer also lists a 25% Black Friday code, BLACKFRIDAY2026, valid for its 2027 events until Dec. 1, 2026, with terms attached. Registrations are subject to approval.

Sessions with a precon angle

Morning

  • Keynote: Field AI: Connecting People, Processes and Data to Create the Construction Intelligence Platform of the Future, 8:00 AM. The agenda lists Robin Patra, head of data, analytics and AI at Keeley Construction, next to it.
  • Making Progress Visible: Reality Capture and Standardized Data, 9:00 AM, with Meena Abdelkodoos, prefabrication data manager at DPR Construction, listed alongside.

10:45–11:45 AM tracks

Three relevant sessions run at the same time:

  • Building the Case, Proving the Value: AI ROI in Construction (Track 2), Alex Elsayegh, PhD, AI platforms lead at McCarthy Building Companies.
  • Separating Hype from Opportunity: Where Agentic AI Can Deliver Real Business Value (Track 4), Darshit Jasani, director of AI at ARCO/Murray.
  • From Field to Enterprise: How AI Is Transforming Construction Modeling and Decision-Making (Track 1), Landon Pascua and David Mettler of Willmeng Construction.

Then a fireside chat, From Automation to Evidence: Building and Proving AI Value Over Time (11:45 AM–12:15 PM), with Adam Krob of Boh Bros. Construction and Caitlin Plein of Fortis Construction. Of everything on the program, the title of this one is closest to the question a precon leader should be asking.

Afternoon

  • Building AI on Solid Ground: Standardizing Data, Processes, and Delivery (Track 1, 2:15–3:15 PM), John Barrett, design manager at Satterfield & Pontikes Construction.
  • Mapping AI Opportunities Across Every Construction Function (Track 4, 2:15–3:15 PM). No speaker or description listed yet; it may or may not reach preconstruction.
  • Turning Project Data into Decision-Ready Information (Track 3, 3:45–4:45 PM), Devyn Perez, director of pre-construction at Repipe Specialists. The only session led by someone with a precon title, and the one to prioritize.
  • Panel: The AI Adoption Journey: Building Buy-In Across the Organization (4:45–5:30 PM), with David Solomon (Turner Construction), Dave Mueller (Stellar), Stephen Brooke (Burns & McDonnell) and Brandon Niblock (BNBuilders).

A midday presentation, "Which Technologies Will Create Competitive Advantage and Which Won't?", had no speaker listed.

How to judge an AI claim from the audience

Most AI talks at an event like this will describe a result: a process that got faster, a report that writes itself, a decision made earlier. Those results may be real. The problem for an estimator is that a result tells you little about whether the same approach will hold on a bid package with four addenda and a deadline. Three questions get underneath it.

1. Where is the source evidence? When the system says a scope item is included or a requirement applies, can it point to the sheet, the specification section or the proposal line? An answer without a source is an answer someone has to re-verify by hand, which means the work did not go away. Ask the presenter to show one output and its trail.

2. What happens when the documents change? Preconstruction is a moving target. A drawing revision can change a quantity, a trade boundary and a sub's coverage at once. Ask whether the system knows what an addendum affected, or whether someone reruns it and compares by eye. Our piece on how drawing revisions cascade through scope, bids and the estimate describes what should be tracked.

3. Who reviews, and what do they see? Ask who signs off on the output, what the reviewer is shown, and what happens to a miss the reviewer catches. If the answer is "the user checks it," ask how long that check takes and whether it is recorded.

Add a fourth for any number shown on stage: measured against what baseline, on which projects, and by whom? An ROI figure without that is an anecdote. Our guides to testing the evidence behind AI output and evaluating AI preconstruction software turn these questions into a test you can run on your own bid package.

Who attends

The organizer lists VPs, directors, global heads and managers across data science and analytics, AI and machine learning, technology and innovation, enterprise architecture, digital transformation, IT, systems integration, project management, business intelligence, scheduling and resource planning, operations, risk and QA/QC. The agenda page describes data, AI/ML, IT and construction technology specialists together with solution providers. Sponsor categories include AI and data platforms, BIM, reality capture, scheduling and project management software, digital twins and robotics, so expect an active exhibition.

For a precon leader, that mix means the most useful conversations are with peers at other GCs who run data or VDC teams: how they decided where AI goes first, and whether estimating was on that list.

Practical tips

  • Wait for the venue before booking travel you cannot change. The organizer had not announced it as of Nov. 23, 2026.
  • Book the pass by Dec. 18, 2026, or by Dec. 1 if the Black Friday code applies to you.
  • Plan the 10:45 AM block. The ROI, agentic AI and modeling tracks run in parallel. If two people go, split them.
  • Write the three questions on a card and use them in Q&A and on the exhibition floor.
  • Download the presentations afterward. The organizer says registered attendees can.
  • Contact: AMG World at +44 (0)113 3970 379, per the organizer.

Where Piper fits against those three questions

The three questions are the right test for any AI in preconstruction, including ours. Source, revisions and review are hard because they depend on a system holding one consistent picture of the project as it changes, rather than answering each prompt from scratch.

Piper is an AI operating system for preconstruction built on that idea: one evolving understanding of the project and of the company's own standards, applied across scope generation, bid leveling, final bid review and surveys of the project documents. Findings stay linked to the page they came from, and bid leveling measures each proposal against the intended scope rather than only against the other bids. The estimator reviews and remains responsible for every commitment. If you want to put the three questions to Piper directly, the demo request is at the bottom of this page.

FAQ

When and where is the AI & Data Transformation in Construction Summit Austin 2027?

Tuesday, Jan. 26, 2027, in Austin, Texas. The organizer, AMG World, had not announced the venue when checked on Nov. 23, 2026.

How much does a pass cost?

AMG World lists AEC organization passes at $995 through Dec. 18, 2026 and $1,195 after. Technology and solution provider passes are $1,795, then $1,895.

Are there sessions on estimating or preconstruction?

None is titled for estimating. The closest is "Turning Project Data into Decision-Ready Information" (3:45 PM), led by a director of pre-construction, plus sessions on AI ROI and proving AI value over time.

How should an estimator evaluate AI claims made at the event?

Ask where the source evidence is, what happens when the documents are revised, and who reviews the output and what they see. For any number, ask for the baseline and the projects behind it.

ShareLinkedInX

Where this fits in Piper

Related reading

Guide7 min

How to evaluate AI preconstruction software

Test AI preconstruction software on representative documents, company standards and revisions. Inspect findings, source accuracy and the effect of an addendum on prior work.

Tower crane above steel reinforcement

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.