BE-Ex Geothermal Showcase 2026: questions before a Manhattan study becomes an installation allowance

Separate geothermal study, enabling work and installation scope before a Manhattan preconstruction allowance becomes a commitment.

Guide3 min read

Published

Construction scaffolding interior

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Choose the package being priced
  2. Work a hypothetical study-to-package handoff
  3. Separate program discussion from construction authorization

Before a Manhattan multifamily GC carries a geothermal installation, establish whether the owner is buying a study and testing, early enabling work, or a designed installation. Those are different packages with different evidence and risk. A feasibility allowance can fund an investigation without proving that a particular ground system is technically suitable, eligible for a program or ready to build.

BE-Ex advertises a Geothermal Showcase for December 9, 2026, from 9:30 to 11 a.m., at Building Energy Exchange and online; doors open at 9 a.m. The planned program includes Con Edison geothermal program and funding discussion and an Alafia project presentation, with some participants still to be announced. Alafia is in Brooklyn, so its example is not a site design for a Manhattan property. Check the event listing and agenda before relying on them.

Choose the package being priced

A study or test phase should state the investigation, deliverables, access assumptions and who interprets the results. An enabling package needs a defined scope and a reason it remains useful under the options being considered. An installation package needs an accepted design basis, trade boundaries and an agreed treatment of unresolved conditions. The estimator should label a provisional sum for an unknown installation as an allowance with explicit assumptions, not as a complete contractor commitment.

Con Edison's geothermal information describes subsurface thermal conductivity testing before final design and installation of a large system. Ask the responsible designer what testing is appropriate to the proposed project and what decisions it will support. A program description does not establish that this building qualifies for funding.

Work a hypothetical study-to-package handoff

Assume an occupied Manhattan apartment building is considering ground-source heating and cooling. The owner has requested a preliminary allowance but has not issued a final design. This register is a set of questions to the responsible parties, not a design or permit checklist.

Handoff itemEvidence or decision requestedParty to resolve before firm scope
Site and groundAvailable site records, utilities, ground information, access and proposed investigationOwner supplies records; designer defines investigation
Testing and design basisCompleted tests, interpretation, loads and selected design basisDesigner confirms adequacy and outstanding work
Building connectionsHeating, cooling and domestic hot water boundaries, distribution and controlsMechanical designer defines interfaces; trades price assigned work
Occupied operationAccess, shutdown windows, protection and temporary service assumptionsOwner sets operating constraints; design and GC plan the work
Program and utilityEligibility process, account and application status, utility interfacesOwner and utility or program partner confirm in writing
Scope and acceptanceIssued drawings, trade boundaries, testing and handover deliverablesDesigner issues basis; owner approves procurement and GC levels quotes

For each line, record the source and revision, a named owner, the date needed, and what the estimate currently carries. If ground access is unconfirmed, distinguish the price of the proposed investigation from any assumed installation price. If domestic hot water is excluded from the study, do not quietly include a building-wide conversion in the construction allowance.

Separate program discussion from construction authorization

At the showcase, ask what information a program review needs, when eligibility is determined and whom the owner should contact. Ask the designer what investigation must precede a project-specific design and which conditions could change the selected approach. Ask the contractor bidders what their study or installation price includes, what is by others and which findings trigger a change.

No presentation or general program page substitutes for written eligibility confirmation, a design decision or an awarded scope. Carry the building-side responsibilities into the MEP coordination review, and separate compliance aims from construction scope before treating the allowance as an approved package.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow