How to write an earthwork and grading scope subs will price the same way

Define earthwork by accepted surfaces, material states and handoffs. Use a reusable scope outline to align grading, undercut, haul and unit-price bids.

Guide11 min read

Published

Tower crane above steel reinforcement

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Establish the document basis before assigning quantities
  2. Define grading by the surface the next trade receives
  3. Separate planned soil treatment from uncertain-condition work
  4. Put a material state and complete operation beside each unit price
  5. Write water control and erosion control as connected work
  6. Reusable earthwork bid-package outline
  7. General and document basis
  8. Inclusions
  9. Exclusions and work by others
  10. Clarifications and bid response
  11. Alternates and unit prices
  12. Acceptance and issue check
  13. Keep the earthwork basis connected through solicitation

For a GC estimator issuing a ground-up commercial earthwork package at bid-ready CDs, the scope should define which accepted surfaces the subcontractor must deliver, what material may be used to create them, and what happens when actual conditions differ from the bid basis. “Complete excavation and grading per plans and geotechnical report” does not establish those three things.

The position of this guide is simple: write earthwork around deliverables and measurement rules before writing a list of equipment operations. Two bidders can include excavation, fill and compaction yet price different work if one stops at rough grade, another delivers pavement subgrade, and only one carries the building-pad over-excavation.

The outline below is for a GC-managed subcontract or bid package. It is not a substitute for an engineer’s earthwork specification, a differing-site-conditions clause, or an agency’s measurement and payment provisions. On schematic or DD pricing, use explicit assumptions rather than presenting an unresolved grading design as a fixed commitment; see pricing design intent when drawings are incomplete.

Establish the document basis before assigning quantities

Give every bidder the same reference register. Include document titles, dates, revisions and applicable locations, not just “Division 31.”

For an earthwork package, the recommended register contains:

  • Civil drawings: existing topography, demolition limits, grading plans, sections, pavement details, drainage features and erosion-control plans.
  • Architectural and structural drawings: building footprint, finished floor elevations, slab build-ups, foundations, retaining structures and pad limits.
  • Utility drawings and details: trench sections, bedding, initial and final backfill, structures and restoration limits.
  • Geotechnical documents: report, supplements, boring logs, groundwater observations, material suitability criteria and recommendations by work area.
  • Specifications: the actual project earthwork sections plus related clearing, erosion control, shoring, dewatering, paving, landscaping, utilities and Division 01 requirements.
  • Bid instructions and changes: addenda, issued prebid answers, alternates, allowance definitions, price schedules and available permit conditions.

UFGS 31 00 00, Earthwork, August 2023 with references aligned to October 2026, is a useful technical completeness check. It addresses structural and utility excavation, subgrade preparation, borrow, drainage, compaction, finishing and testing. It is a federal guide specification requiring project-specific editing, not an automatic requirement for a private commercial job.

The register should also state how the contract treats the geotechnical report. Is it a contract document, information made available to bidders, or a basis incorporated through particular specification requirements? Do not let the scope sheet silently change that status. Identify conflicts for resolution under the project’s contract process.

Recommended cross-document check: for each area, read the finished elevation from the drawing, subtract the assembly above earth subgrade, then apply the applicable geotechnical preparation requirements. Record all three sources beside the deliverable. This connects design geometry to soil treatment without asking the bidder to infer which layer the GC meant.

For the broader package process, use the construction scope generation guide; the rest of this article focuses on the earthwork-specific basis.

Define grading by the surface the next trade receives

“Rough grading” and “fine grading” should be labels for defined work, not the entire definition. Specify the limit, target surface, acceptance criteria, verifying party and protection period.

Use an area-by-area schedule like this. The allocations are illustrative choices, not universal trade ownership.

Work areaEarthwork deliverable to defineSeparate responsibility to assign
Building padExtent, earth subgrade elevation, prescribed over-excavation, replacement fill and acceptanceFooting excavation, slab aggregate and vapor barrier
Pavement areaEarth subgrade below the specified pavement assembly, tolerances and acceptanceAggregate base, final trimming if reassigned, and pavement placement
Landscape areaSubsoil elevation below the specified planting-soil profileTopsoil supply, spreading, planting and final landscape grading
Utility corridorExplicit inclusion or exclusion of excavation and backfill stagesBedding, pipe-zone backfill, trench protection, testing and surface restoration
Drainage featureGeometry, soil preparation and accepted earth surfaceLining, riprap, structures, stabilization and maintenance

UFGS 31 00 00 defines subgrade as earth directly below foundations and below granular base in slab and pavement areas. Its execution provisions separately address structural subgrade, pavement subgrade and topsoil. That distinction matters when converting a finished-surface plan into an earthwork handoff. See the guide’s definitions and execution sections.

Illustrative elevation check: a pavement finished elevation is 100.00 feet. The detail has 4 inches of asphalt and 8 inches of aggregate base. The earth subgrade target is 99.00 feet, not 100.00 feet.

Across a level 27,000-square-foot area, that one-foot difference is 27,000 ÷ 27 = 1,000 cubic yards of geometric volume, illustrative. If the earthwork bidder carries finished pavement elevation while the paving bidder also carries the full pavement assembly, the scope basis has created excess fill or later excavation. Neither bidder’s quantity needs to be internally wrong for the combined estimate to be wrong.

The check is to put the delivered elevation beside the detail reference and confirm the receiving trade’s scope starts at that same surface.

There is a legitimate judgment call here. The GC may keep precision subgrade trimming with earthwork or assign it to the paving subcontractor. Decide based on equipment, sequencing, testing and who can accept the surface immediately before base placement. Whichever arrangement is chosen, define who repairs rutting or disturbance between acceptance and paving. Otherwise an apparently clean quantity boundary leaves a return operation undefined.

Separate planned soil treatment from uncertain-condition work

Do not place prescribed building-pad over-excavation in the same bucket as unquantified unsuitable soils.

Use three distinct treatments in the bid package:

  1. Planned preparation: stripping, scarification, moisture conditioning, prescribed over-excavation and replacement required by the issued design basis. Identify area, depth and material.
  2. Condition-dependent treatment: additional removal or stabilization following observation and authorization. State a common bid quantity or another explicit pricing mechanism.
  3. Contractor-caused corrective work: treatment associated with an assigned protection obligation that was not fulfilled. Address responsibility consistently with the subcontract, without treating every soft area as proof of fault.

The distinction is technically important. UFGS 31 00 00 says subsurface information may vary between borings and separately defines unstable material. It also notes that satisfactory material can become unstable through ineffective drainage, dewatering, freezing or excessive loading. Its proof-rolling guidance distinguishes verifying a surface from identifying areas needing removal. Read those provisions together.

The resulting scope rule is not “all unsuitable soils by earthwork.” It is: identify the planned treatment, establish how additional treatment is authorized, and record the condition before disturbance or concealment.

For additional undercut, specify who observes the condition, who can authorize commercial work, who measures it, and what record supports payment. A geotechnical recommendation and a GC authorization serve different purposes. Where safe and practicable, require survey or agreed measurements before removal and before replacement covers the excavation. Define the emergency notification route without delaying necessary safety measures.

Rock needs a separate definition and pricing basis. Do not use “anything requiring a breaker” unless that is the actual agreed contractual definition. UFGS distinguishes hard or unyielding material from rock; copy the project’s applicable distinction rather than inventing a production-based threshold. Contaminated material should have its own notification and treatment procedure, not be swept into an ordinary unsuitable-soil rate.

For interface diagnosis beyond the scope-writing task, use earthwork scope gaps GCs find too late.

Put a material state and complete operation beside each unit price

A cubic yard must describe a state:

  • Bank: material in place before excavation.
  • Loose: excavated material in a truck or stockpile.
  • Compacted: material placed and compacted in its final position.

The December 2023 WisDOT-sponsored weight-volume research examines those transitions and material-dependent conversion factors. It is research on Wisconsin geomaterials, not a national specification or a set of factors to apply automatically to a commercial site.

Its practical implication for scope writing is broader than the local test results: do not ask one unexplained “shrink factor” to define excavation payment, truck capacity and accepted fill volume. Establish the direction of conversion and the project-specific basis.

Illustrative bid-basis example: the common quantity schedule has 10,000 bank cubic yards of cut and 9,000 compacted cubic yards of required fill. Assume, solely for this example, that each bank cubic yard of reusable cut yields 0.90 compacted cubic yard.

With all cut reusable, 10,000 × 0.90 = 9,000 compacted cubic yards. The site balances on that assumption.

Now the common allowance identifies 1,000 bank cubic yards of that cut as unsuitable and requiring export. Reusable cut falls to 9,000 bank cubic yards. It produces 9,000 × 0.90 = 8,100 compacted cubic yards. The replacement demand is 900 compacted cubic yards, illustrative, even though the geometric cut and fill totals have not changed.

Assume the scheduled rates are $18 per bank cubic yard for unsuitable removal, haul and disposal, and $32 per compacted cubic yard for approved replacement fill supplied, placed and compacted. The illustrative allowance is:

  • Removal: 1,000 × $18 = $18,000.
  • Replacement: 900 × $32 = $28,800.
  • Total: $46,800, illustrative.

This assumes the removed material came from the planned cut, not additional excavation below design subgrade. Additional undercut would require a separate geometric replacement calculation.

If the removal rate replaces work already included in the base excavation price, define the base-work credit or use an incremental rate. Adding a full removal rate on top of already carried excavation can duplicate cost. Equally, a $18 removal rate alone does not price replacement fill.

For every scheduled unit price, write:

Item; included operations; material classification; measurement state; measurement method; authorization; common bid quantity; base-price overlap or credit; rate applicability limits.

For import and export, also state source approval, loading, haul, disposal or tipping fees, stockpile handling and any haul-distance assumption. If payment uses tons, identify ticket requirements and any approved conversion used for comparison. Do not convert tons to cubic yards without a stated basis.

Write water control and erosion control as connected work

A dewatering exclusion does not answer who keeps the excavation workable, who controls discharge, or who protects the completed pad while other trades use it.

OSHA 29 CFR 1926.651 requires adequate precautions where employees work in excavations with accumulating water. It also addresses competent-person monitoring of water-removal operations and diversion where excavation interrupts natural surface drainage. Those are employer safety obligations, not a subcontract price-allocation schedule.

Stormwater requirements are a separate basis. EPA’s resources distinguish site inspections, dewatering inspections, maintenance and corrective actions, and say SWPPPs must follow the applicable state or EPA permit. As of November 24, 2026, EPA’s page identifies the modified 2022 CGP and a proposed 2027 CGP. Do not treat the proposal as the issued requirement or assume EPA’s permit governs every site. EPA permit documents and implementation resources provide the starting point.

The combined estimating decision is to price a water-control chain, not merely a pump:

  • Surface diversion and routine excavation water control.
  • Any engineered groundwater-lowering system, separately defined.
  • Conveyance, treatment, discharge location and applicable authorization.
  • Inspection, monitoring, records and corrective work required by the actual permit.
  • Erosion-control installation, maintenance, relocation, removal and stabilization.
  • Protection and responsibility through each phase handoff.

A specific failure can otherwise develop: earthwork includes pumping but excludes discharge treatment; the GC carries erosion-control installation but no dewatering inspection support; then wet conditions require both activities before excavation can proceed. The missing scope is an operating arrangement, not another excavation quantity.

Also connect the water plan to the unsuitable-material mechanism. If a pad becomes unstable after an unprotected work interval, the GC needs condition and handoff records to assess cause and contractual treatment. An undercut ticket alone cannot establish whether the work arose from an original soil condition or later disturbance.

Reusable earthwork bid-package outline

Use the following as a drafting structure. Replace every bracketed field and remove irrelevant items. This is recommended scope organization, not ready-to-sign contract language.

General and document basis

Identify [work areas], [limits of disturbance], [drawing and specification register], [geotechnical document status], [addenda], [phase sequence], [access and working hours] and [receiving trades]. State the base-bid quantity basis and which quantities are informational versus used for payment.

Assign primary survey control, earthwork layout, quantity verification and acceptance surveys separately. Assign permit acquisition and fees by permit name rather than using a blanket “permits excluded.”

Inclusions

For each included operation, record its area, endpoint and source:

  • Clearing, grubbing, stripping, segregation and topsoil stockpiling.
  • Bulk cut, on-site movement, embankment and building-pad preparation.
  • Planned over-excavation, approved fill supply and placement.
  • Moisture conditioning, compaction, proof rolling and required test support.
  • Structural excavation and backfill, with footing and retaining-wall limits.
  • Utility trench work, distinguishing excavation, bedding, pipe-zone fill and final backfill.
  • Earth subgrade delivery for paving and landscaping.
  • Import, export, stockpile rehandling and disposal documentation.
  • Drainage, water control, erosion controls and graded-surface protection.
  • Phase completion, acceptance records and demobilization or return work.

For compaction, reference the project’s percentage, laboratory test basis, lift and moisture requirements by material and location. Do not reduce them to “compact to specification” in the bid response schedule. UFGS treats compaction methods and material-specific testing as project-dependent provisions. UFGS definitions and testing guidance illustrate why a generic percentage is incomplete.

Exclusions and work by others

Pair each exclusion with a named package or GC carry and a defined interface. Address rock, additional unsuitable soils, specialized dewatering, testing, SWPPP work, layout and permits explicitly.

If independent acceptance testing is by the owner or GC, still identify who provides access, coordination and operational support. Separate initial testing, contractor quality control, rework and retesting responsibility. “Testing by others” should not remove the obligation to deliver an accepted surface.

Clarifications and bid response

Require bidders to identify deviations against numbered scope items. Ask for their grading endpoints, reusable-soil assumptions, import/export basis, unit states, allowance treatment and return-work assumptions. This gives the GC a direct reconciliation path instead of a collection of unrelated exclusions.

Alternates and unit prices

Describe each alternate’s complete changed work and whether it adds to or deducts from the base bid. For soil stabilization alternatives, identify the required approval and performance basis; a bidder’s cheaper method is not an approved design change.

Keep common allowance quantities visible. State whether the allowance is embedded in the base total or added separately, and how actual authorized work replaces it.

Acceptance and issue check

Before solicitation, verify that every work area has an endpoint, every endpoint has a receiving party, and every uncertain quantity has a pricing mechanism. Review earthwork scope-writing mistakes for wording failures without turning this scope into a blanket transfer of unknown conditions.

When an addendum changes a grade, detail or treatment, update the affected endpoint, quantity basis and bid response requirement together. Use the drawing-revision cascade guide for that change-control workflow.

Keep the earthwork basis connected through solicitation

The durable record is the connection between the source, delivered surface, material assumption, responsible package and pricing treatment. Keeping only the final scope paragraph loses the reasoning needed when a detail or soil-treatment instruction changes.

Piper’s Scope Generation workflow organizes drawings, specifications, addenda and company requirements into trade-specific scopes with source references. It can surface unclear trade boundaries and affected scope for review as project information changes. The team still decides grading handoffs, soil assumptions, allowance treatment and the scope issued to bidders.

The standard to preserve is not identical bid totals. It is that every bidder prices the same deliverables and exposes departures from the same basis.

FAQ

What should an earthwork scope of work include?

Include the document basis, work limits, accepted grading surfaces, soil preparation, excavation and fill operations, haul and disposal, water control, testing support, trade handoffs and pricing rules. Organize exclusions, work by others, clarifications, alternates and unit prices separately so bidders can identify departures against specific scope items.

Should unsuitable soils be included in the lump sum?

Include prescribed treatment in the base scope and give uncertain additional treatment an explicit pricing mechanism consistent with the contract. A common allowance or measured unit-price item can establish a comparable basis. Define authorization, measurement and replacement work, and avoid adding full excavation rates to work already included in the base.

Who should carry fine grading, earthwork or paving?

Assign it to the package best positioned to deliver and accept the specified surface at the required time. There is no allocation rule in this guide that applies to every project. Define elevation, tolerance, testing, acceptance and protection through the handoff so neither trade prices a different starting condition.

How should earthwork unit prices be written?

State the complete operation, material classification, bank or loose or compacted measurement state, measurement method, authorization and base-price overlap beside the rate. Removal and replacement may use different units. Common bid quantities make the responses comparable without pretending those quantities are guaranteed actual conditions.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.