ENR Regional Best Projects Awards, December 2026: send the person who owns owner relationships, not the one who wants training
ENR's December 2026 regional awards stop in Salt Lake City, Denver, Boston and Seattle. Dates, seat and table prices, and who on a GC precon team should go.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 6 min
- Published
On this page
- The four December stops
- What it costs: seat or table
- Honorees ENR names on the event pages
- Who should go from a GC, and why
- The precon director or BD-facing chief estimator
- What the room tells you that a bid board does not
- Who should skip it
- Practical tips
- Where Piper fits when a new relationship turns into a bid
ENR closes its 2026 regional Best Projects series with four December stops: Salt Lake City on Wednesday, Dec. 2, Denver on Friday, Dec. 4, Boston on Friday, Dec. 11 and Seattle on Tuesday, Dec. 15. A single seat is $185 at the early rate and a table of 10 is $1,750, the same at every stop.
Be clear about what you are buying. These are awards ceremonies: three breakfasts and one luncheon, with networking before the plates arrive and an awards program after. ENR lists no education sessions. Nobody on a GC's precon team will learn a new estimating method in these rooms. What they can learn is who is building in the region, which owners are putting projects on the street and which design firms are drawing them. For a precon director, a chief estimator on negotiated work or anyone whose pipeline depends on being invited to price, that is worth a morning. For a staff estimator looking for technical content, it is not.
Facts below come from ENR's upcoming events page, the event pages for Salt Lake City, Denver, Boston and Seattle, and the series registration page, checked Nov. 24, 2026. ENR runs 12 regional stops in this series, from Oct. 23 to Dec. 15, 2026; this guide covers the last four.
The four December stops
| Item | Salt Lake City | Denver | Boston | Seattle |
|---|---|---|---|---|
| ENR region | Intermountain (Mountain States) | Colorado and Wyoming (Mountain States) | New England | Northwest |
| Date | Wed. Dec. 2, 2026 | Fri. Dec. 4, 2026 | Fri. Dec. 11, 2026 | Tue. Dec. 15, 2026 |
| Format | Breakfast | Breakfast | Breakfast | Luncheon |
| Venue | Salt Lake City Marriott Downtown at City Creek, 75 S W Temple St | Embassy Suites by Hilton Denver Downtown Convention Center, 1420 Stout Street | Hyatt Regency Boston, One Avenue De Lafayette | Renaissance Seattle Hotel, 515 Madison |
| Networking opens | 8:00 AM | 8:00 AM | 8:00 AM | 11:00 AM |
| Meal | 8:45 AM | 8:45 AM | 8:45 AM | 11:45 AM |
| Awards program | 9:15 AM | 9:15 AM | 9:15 AM | 12:15 PM |
| Ends | 11:00 AM | 11:00 AM | 11:00 AM | 2:00 PM |
| Early rate ends | Nov. 18 (passed) | Nov. 20 (passed) | Nov. 27 | Dec. 1 |
Times are as ENR lists them on each event page. The three breakfasts end at 11:00 AM, so the rest of the day is yours. Seattle runs through lunch and ends at 2:00 PM.
What it costs: seat or table
ENR uses one price list for all four stops.
| Registration | Early rate | After the early rate |
|---|---|---|
| Individual seat | $185 | $200 |
| Table of 10 | $1,750 | $1,900 |
| Per seat at a full table | $175 | $190 |
The per-seat line is simple division of ENR's table price. A table saves $10 a seat, which is not the reason to buy one. The reason is control over who sits next to you for two and a half hours.
A table is a relationship tool. A GC that buys one decides who shares it: a project executive from an owner you want to work for, a principal from an architecture or engineering firm whose drawings you price, a key trade partner. Those are guests a precon leader would struggle to get into a meeting room in December, and a breakfast honoring the region's work is an easy invitation to accept. Before you invite anyone from a public owner, ask whether their agency's gift or ethics rules allow it. Public agencies often restrict hosted meals from contractors that bid their work, and finding that out at the door is worse than asking first.
If you will not fill a table with people you actually want to talk to, buy seats. A table of your own staff at an awards breakfast is a team outing, not business development.
Honorees ENR names on the event pages
Each event page lists a handful of named honorees. These are only the categories ENR shows on the pages; the full 2026 regional winner lists, project by project, are published on ENR.
| Award | Salt Lake City | Denver | Boston | Seattle |
|---|---|---|---|---|
| Legacy Award | Ralph L. Wadsworth | Tom Horsting | Robin Greenleaf | David Baska |
| Contractor of the Year | Engineering Structures Inc. | Adolfson & Peterson | O&G Industries | Mortenson |
| Design Firm of the Year | RS&H | RS&H | Not listed on the page | PAE |
| Owner of the Year | St. Luke's Hospital | Cherry Creek North | Not listed on the page | Not listed on the page |
| Specialty Contractor of the Year | Not listed on the page | RK Industries | Not listed on the page | Rosendin Electric |
Read the regional winner list on ENR before you go, not after. It is the most useful prep a precon leader can do for this event.
Who should go from a GC, and why
The precon director or BD-facing chief estimator
The person to send is whoever on your team is judged on being invited to price work, especially negotiated, CM at-risk or design-build work where the owner picks the contractor before there is a number. On a hard-bid public job, a breakfast conversation does not change who gets the bid documents. On a negotiated job, the relationship often decides whether you are on the short list at all. Our comparison of hard bid, CMAR and design-build covers how much the selection method shifts where precon effort pays off.
What the room tells you that a bid board does not
Which owners are active. An owner honored for a completed project often has a capital program behind it, and hospital systems, campuses and districts that finished one job may already be planning the next. A conversation at breakfast is a way to hear what is coming before it reaches a plan room.
Which design firms are drawing the work you will price. A precon team lives with an architect's and engineer's habits: how complete the drawings are at each issue, how the specifications are written, how fast pre-bid questions get answered and what gets left for the contractor to figure out. Meeting the principals of the design firms winning in your region is a chance to learn those habits before the drawings arrive. Our guide to estimating from design intent on incomplete drawings covers why that knowledge matters most on early design sets.
Who your competitors are teaming with. The contractor, design firm and owner on an honored project are a team that worked. Notice who sits with whom.
Who should skip it
A staff estimator who wants technical development will get nothing on the program for it. Field and operations staff may enjoy it as recognition when the firm has a project on the list, but that is a different reason to attend.
Practical tips
- Register for Boston by Nov. 27 and Seattle by Dec. 1 for the early rate. Salt Lake City and Denver are already at the regular rate of $200 a seat or $1,900 a table.
- Register through ENR's series page at na.eventscloud.com/26rbp, which covers all four stops.
- Arrive for the networking hour. At the breakfasts it runs from 8:00 to 8:45 AM, and in Seattle from 11:00 to 11:45 AM. Once the meal and the awards start, conversation gets short.
- Go in with a list. Pick five people from the honored owners, design firms and trade partners you want to meet, and why. Without one, the morning turns into catching up with people you already know.
- Plan the follow-up before the event. The useful outcome is a meeting in January about an owner's upcoming program, not a stack of business cards.
- If you host a table, seat deliberately. Put your precon lead next to the guest whose work they will price.
Where Piper fits when a new relationship turns into a bid
A good morning at one of these events ends with an invitation to price a job for an owner or a design firm your team has not worked with before. That is where new relationships are won or lost: the first set of drawings from an unfamiliar architect, an owner's own requirements that nobody on the team has read before and a bid date that does not move.
Piper is an AI operating system for preconstruction that keeps one evolving understanding of each project and of your company's own standards. On a first job for a new owner, a survey runs your firm's pre-bid questions across the whole document set, with each answer linked to the page it came from, so the owner's particular requirements surface early. Scope generation applies your company's trade boundaries to an unfamiliar design firm's drawings, and final bid review checks the finished number against what the owner asked for before it goes out. The estimator still owns the number and the relationship. The demo request at the bottom of this page is there if you want to see it on a real set.
FAQ
When are the December 2026 ENR Regional Best Projects events?
Salt Lake City (Intermountain) on Wednesday, Dec. 2; Denver (Colorado and Wyoming) on Friday, Dec. 4; Boston (New England) on Friday, Dec. 11; and Seattle (Northwest) on Tuesday, Dec. 15, 2026, according to ENR.
How much does it cost to attend?
ENR lists the same prices at all four stops: $185 per seat or $1,750 for a table of 10 at the early rate, then $200 and $1,900. The early rate ends Nov. 27 for Boston and Dec. 1 for Seattle; it has passed for Salt Lake City and Denver.
Is there an education program?
ENR lists none. Each stop is an awards ceremony with networking, a breakfast or luncheon and the awards program.
Where can I see the full list of 2026 winners?
The event pages name only a few honorees per stop. ENR publishes the full regional winner lists on its website.
Who from a general contractor should attend?
A precon director or chief estimator who works with owners and design firms on negotiated work, ideally with a list of people to meet. Staff estimators looking for technical content will not find it here.
Related reading
Construction conferences for preconstruction teams, December 2026 to April 2027
Ten construction conferences from December 2026 to April 2027, compared for GC estimators and precon leaders by date, city, cost and who on the team should go.

Preconstruction services: define the deliverables behind the next pricing commitment
Preconstruction services should resolve decisions before a price is committed. Define the scope, estimate, trade coverage, assumptions and approval evidence.

Design intent is what estimators price when the drawings stop talking
Review implied assemblies and ambiguous interfaces, document the source and decision owner, and keep assumptions visible even when the drawing set appears complete.

Hard bid vs CMAR vs design-build: how estimating workflows differ
How GC estimators adjust for hard-bid (design-bid-build), CMAR, and design-build. Scope timing, risk allocation, and bidding process compared side by side.

Chief estimator vs. preconstruction manager: define the decisions before dividing the work
Chief-estimator and preconstruction-manager titles vary by GC. A practical decision-rights model for scope, bid coverage, pricing, review and owner commitments.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.