I-35 Capital Express drainage tunnels: review shafts, pumping and corridor interfaces
Review I-35 Capital Express drainage scope across tunnels, access shafts, pumping and controls, with a register for installation access and system turnover.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
TxDOT reports that construction of the I-35 Capital Express Central Drainage Tunnel and Pump Station segment began in mid-2025, with completion anticipated in 2029, weather permitting. The scope includes two drainage tunnels, shafts and a pump station. TxDOT drainage tunnel segment Source status checked November 17, 2026. Price tunnel, shaft and pump work against a single access and turnover sequence. A civil completion date alone does not settle who makes the shaft ready for equipment installation or who tests the system through its discharge.
Separate tunnel access shafts from pumping interfaces
The following register is estimating analysis, not a statement of the owner’s contract assignments. The owner overview establishes the project context; the current drawings, specifications and package documents determine what a bidder must carry.
| Interface | Review boundary | Decision to resolve |
|---|---|---|
| Tunnel and shafts | Excavation, lining and access interfaces | Who delivers dry, accessible installation areas and closes temporary openings? |
| Pump equipment | Equipment setting and mechanical connections | Who provides lifting, temporary support and final alignment? |
| Power and controls | Feed, instrumentation and control interfaces | Who terminates and tests signals between equipment and site systems? |
| Outfall | Discharge connection and surrounding work | What are the issued discharge limits and test boundaries? |
| Highway access | Work zones, delivery and restoration | Which party provides access, traffic control and final reinstatement? |
TxDOT identifies SAK/Shea JV Construction and Webber Waterworks as contractors. That identification does not establish the division of subcontracts. TxDOT drainage tunnel segment
Follow the drainage system through its discharge
Use separate tunnel-shaft and pump-station rows. List access periods, installation openings and temporary works at their documented locations. Track each exclusion to a priced scope, a documented allowance or an RFI; the table does not represent the awarded contract split.
The overview establishes two tunnels and maintenance-access shafts; it does not establish that a pump is installed at every shaft. Keep a tunnel-shaft register and a pump-station register separate, linking them only at interfaces supported by the issued drawings. A tunnel contractor's excavation completion is a different milestone from mechanical access and operational acceptance.
Documents to request before committing
Request shaft-specific access and closure details, pump-station installation openings, equipment and control interfaces, and discharge limits. Assign temporary access and lifting requirements at the actual equipment location. Do not apply a hypothetical pump-trade handoff to every tunnel shaft or assume a public contractor list supplies the subcontract split.
The logistics estimate review provides a broader method for documenting these boundaries and carrying unresolved assumptions through bid review.
Related reading
Construction logistics plans: turn access and storage assumptions into priced scope
A site logistics drawing is useful when its assumptions reach the estimate. Review access, storage, deliveries, handling and repeated moves before pricing.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.