ICAC Beyond the Blueprint 2027: the room that audits your estimate after award
ICAC's first in-person conference runs Jan. 12–13, 2027 near Atlanta. It is an auditor and claims event; why a precon leader on GMP work may still go.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 6 min
- Published
On this page
Beyond the Blueprint: Advancing Excellence in Construction, the first in-person conference of the Institute of Construction Advisors & Consultants (ICAC), runs Tuesday, Jan. 12 and Wednesday, Jan. 13, 2027, at 10000 Avalon Blvd., Suite 600, in Alpharetta, Ga. Sessions run 8:30 AM to 5:00 PM Eastern both days. Registration is $850.
Be clear about what this is. ICAC describes its audience as project managers, schedulers, attorneys, accountants and consultants, and its program is built around audit, fraud, claims and delay. Estimators and preconstruction staff are not named anywhere in it, and no session is about estimating or bidding. A staff estimator learning the trade should spend the money elsewhere.
Our position is narrower: a chief estimator or precon director whose firm works under GMP, cost-plus or CMAR contracts with owner audit rights, or bids public work with certified payroll, should consider it. These are the people who will later test your general conditions, your change-order pricing and your delay costs. Two days listening to how they do it changes how you build the estimate in the first place.
Facts below come from ICAC's event page and its two-day agenda, checked Nov. 23, 2026. One inconsistency: the page banner says Atlanta, while the street address is in Alpharetta, north of the city. Plan around the address.
Logistics at a glance
| Item | Detail |
|---|---|
| Dates | Tuesday, Jan. 12 and Wednesday, Jan. 13, 2027 |
| Hours | Breakfast and registration from 7:45 AM; sessions 8:30 AM to 5:00 PM ET both days |
| Venue | 10000 Avalon Blvd., Suite 600, Alpharetta, GA 30009; conference lobby, 4th floor (building name not stated) |
| Registration | $850 per person; the $750 early rate ended Sept. 30, 2026 |
| Refunds | Written requests by Oct. 1, 2026 with a fee; no refunds after Oct. 15, 2026 |
| Included | Breakfast, lunch, refreshments and an ICAC souvenir item |
| Credits | Up to 16.0 CPE credits; ICAC is a NASBA-registered sponsor |
| Format | Two-day in-person conference, the organizer's first |
The refund dates matter. Per ICAC's page, the refund window has already closed, so treat a registration made now as non-refundable. The page also promotes a new AI track, but describes it two ways (four hands-on sessions in one place, five AI sessions in another), and we did not find a separate schedule for it. Day 1 lunch is listed as a special event with details to come.
Sessions that touch precon
None of these are estimating sessions. Each one is about how a cost or a schedule gets examined after the contract is signed, which is exactly what makes them useful to the person who set it.
Tuesday, Jan. 12: compliance, fraud and leakage
- The $216,000 Question: Rethinking Compliance Monitoring on a Mega-Project, 9:30–10:20 AM, Marisa Van Wie of Naylor Construction Consulting. The agenda describes a risk-based approach to prevailing wage and certified payroll monitoring. If your labor carries on public work assume a classification mix, this is how an owner checks whether that mix held.
- Construction Fraud Trends: How Evolving Technology is Changing the Fraud Landscape, 10:40–11:30 AM, Melissa Goddard of FACT Financial Investigations.
- The Seduction of Fraud: Decoding Infrastructure Financial Crime, 12:15–1:55 PM, Steve Morang of Spire Consulting and Sanya Morang. The agenda mentions procurement cartels and bid rigging. For a GC, the relevant question is what a clean leveling file looks like when an owner or inspector asks why one sub was carried over another. See our piece on public bid leveling documentation.
- Where Construction Projects Leak Money, 3:50–4:50 PM, Valerie Smith and Laura Tatem of HPM. The agenda lists change management, contract compliance, labor and equipment costs and closeout.
Tuesday afternoon also includes a session on technology for reviewing payment applications, led by a technology provider.
Wednesday, Jan. 13: delay, change orders and AI
- Identifying Time Driven Costs in Construction Delay Damages, 10:45–11:45 AM, Anne Anderson and Sam Hadley of Capital Project Management Inc. This is the session we would least want a precon leader to miss. When a job is delayed, the daily cost of extended time usually gets rebuilt from the general conditions the estimate carried. If supervision, temporary facilities and equipment were priced as lump sums with no duration basis, that rebuild is harder to support. Our guide to general conditions versus general requirements covers how to separate time-related from fixed costs.
- The impact change orders have on specific project delivery methods, 1:20–2:10 PM, Vincent Salvatoriello of DeSimone Consulting Engineers, covering design-bid-build, design-build and CMAR. Change-order exposure is priced differently under each. On a GMP, the question becomes what the contingency was meant to absorb and what counts as a change. Related: change directives versus change orders.
- A vendor-led session on algorithmic forensic delay analysis opens the day at 8:30 AM, followed by an ICAC advisory board round table at 9:30 AM.
- Three afternoon sessions cover AI and technology fit: "AI Is a Multiplier. What Are You Multiplying?" (12:30–1:20 PM), "Beyond the Chatbot: A Practical Roadmap for Enterprise AI in Construction" (2:30–4:10 PM) and "When the System Doesn't Fit the Work" (4:10–5:00 PM). These are led by technology firms. Treat them as positions to question, not neutral guidance.
What a precon leader should listen for
Four questions are worth carrying into the room:
- How do auditors trace a cost back to the estimate? On a cost-reimbursable job, the estimate's assumptions become the baseline. Listen for which assumptions auditors find undocumented most often.
- How are time-related costs separated in a delay claim? If the answer depends on a daily rate, check whether your current general conditions template produces one.
- Where does contingency get challenged? Listen for how owners' consultants distinguish contingency use from scope change on GMP work.
- What makes a sub selection defensible? The fraud sessions are about the worst cases. The useful lesson is the ordinary one: a documented reason for every carry.
Who attends
Per ICAC, the conference is for project managers, schedulers, attorneys, accountants and consultants of every discipline. Its attendee categories include project and program professionals; legal and claims; financial and commercial roles such as accountants, cost consultants, auditors, quantity surveyors and forensic analysts; advisors and consultants; and owners, contractors and industry leaders who engage advisors. The CPE credit structure (Group Live, Basic level, Specialized Knowledge) reflects that accounting audience.
For a GC, that means the conversations in the hallway will be with people on the other side of a cost review. That is the value. It is also why a precon leader should pair attendance with someone from project controls or the firm's claims side rather than going alone.
Practical tips
- Hotel: ICAC lists the Hotel Avalon (Marriott), under a minute's walk away, with a group rate booked through links on the event page. The cutoff date was not shown when we checked.
- Parking: ICAC says parking in the adjacent building is complimentary during the day, with instructions to follow closer to the event.
- Airport: the organizer lists Atlanta's airport (ATL) as nearest.
- Bring a closed job. Pick one recent GMP or public project and note where the final cost diverged from the estimate. Ask presenters how they would have examined it. Our piece on the estimate-to-actual gap gives a structure for that comparison.
- Split the AI sessions from the cost sessions. If two people go, send one to Wednesday's delay damages and change-order sessions and let the other cover the afternoon technology block.
Where Piper fits: estimates that survive a cost review
Every session above ends at the same question an auditor asks: where did this number come from, and what was it supposed to cover? The answer usually lives in an estimator's memory, a leveling spreadsheet and an email thread, which is why it is hard to produce two years later.
Piper is an AI operating system for preconstruction that keeps one evolving understanding of each project and of the company's own standards, with findings linked to their source documents. Scope generation writes down what each trade package was meant to include. Bid leveling compares each sub against that intended scope, so the reason one proposal was carried is on record. A survey can pull audit rights, liquidated damages and allowance terms from the contract documents, and a final bid review checks the finished bid against the requirements. The estimator still makes and owns the commitment. To see that record built on one of your own projects, use the demo request at the bottom of this page.
FAQ
When and where is ICAC's Beyond the Blueprint conference?
Jan. 12–13, 2027, at 10000 Avalon Blvd., Suite 600, Alpharetta, Ga. 30009, per ICAC. The page banner says Atlanta, but the address is in Alpharetta.
How much does it cost to attend?
ICAC lists registration at $850 after the $750 early rate ended Sept. 30, 2026. Its page says no refunds are given after Oct. 15, 2026.
Is it useful for construction estimators?
Not as estimating education. The program covers audit, fraud, delay damages and change orders. It is most useful for precon leaders whose estimates are later audited under GMP, cost-plus or public contracts.
Does the conference offer continuing education credits?
ICAC lists up to 16.0 CPE credits as a NASBA-registered sponsor.
Where this fits in Piper
Final Bid Review
Review the estimate against the project behind it and focus senior attention on what still deserves judgment.
Survey
Turn your company's experience into a repeatable survey that captures what the team learns and improves over time.
Related reading
Construction conferences for preconstruction teams, December 2026 to April 2027
Ten construction conferences from December 2026 to April 2027, compared for GC estimators and precon leaders by date, city, cost and who on the team should go.

Construction change directive vs. change order: keep authority, scope and price separate
A change directive can move work ahead before price and time are agreed. A GC review method for preserving the scope baseline, cost evidence and open decisions.

Guaranteed maximum price: review the estimate basis before agreeing to the ceiling
A guaranteed maximum price needs a reviewable scope and cost basis. A GC checklist for reconciling documents, trade coverage, allowances and unresolved design.

General conditions vs. general requirements: separate the contract from the cost plan
General conditions can mean contract terms or job costs. A GC review for separating that language from Division 01 requirements and package pricing assumptions.

Hard bid vs CMAR vs design-build: how estimating workflows differ
How GC estimators adjust for hard-bid (design-bid-build), CMAR, and design-build. Scope timing, risk allocation, and bidding process compared side by side.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.