Landmark entrances: reconcile the accessible route with the approved historic detail

Compare the accessible route, historic entrance fabric, ramp or lift interfaces and approval basis before pricing a landmark entrance.

Guide1 min read

Published

Construction scaffolding interior

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Compare feasible routes and preserved fabric
  2. Illustrative entrance comparison

A landmark entrance estimate needs a coordinated accessibility solution and an LPC-reviewed historic detail. Neither preservation approval nor a proposed ramp alone establishes the complete applicable code solution.

Compare feasible routes and preserved fabric

LPC's barrier-free access guide addresses entrances, ramps, lifts and grade changes alongside accessibility requirements. Depending on the proposal, application materials can include why an alteration to a historic entrance is necessary and why less-invasive alternatives are infeasible. The responsible design professional must establish the applicable code and the project's actual options.

Option componentEvidence neededScope interface
Door and thresholdExisting dimensions and reviewed detailDoor hardware, finish and historic fabric
Grade and routeSurvey and coordinated routeCivil work, drainage and adjoining finishes
RampDesign, landing and railing detailsStructure, paving and attachment
LiftLocation, support and accessPower, enclosure and maintenance access
AlternativeExplanation of feasibility and historic impactDesign and approval effort

Illustrative entrance comparison

At a hypothetical Manhattan landmark, one proposal changes a historic threshold; another introduces a lift at a different location. Request drawings of the entire route, affected fabric, structural attachments and finishes for both. The designer evaluates accessibility and preservation feasibility; the estimator identifies the scope and cost differences. Do not describe either option as compliant or approved without the applicable review.

Carry surveys, temporary access during construction, reinstatement and the responsible applicant. If the selected solution is unresolved at bid, state which option is in the base and price any defined alternate on the same access assumptions. See NYC building code preconstruction review and the tenant improvement scope review.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Landmark entrances: reconcile the accessible route with the approved historic detail | Piper