OGS construction bids: track bid requirements, questions and addenda before submission
Build an OGS bid-requirements register linking questions, addenda, submission documents and trade scope to the correct solicitation and decision owner.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
On an OGS construction bid, the question log is only useful if every official answer is reconciled with the bid form, estimate and subcontractor quotes. Set up that reconciliation when the solicitation arrives, not when the last addendum lands. Identify the issuing office and procurement type first: construction instructions should not be assumed to govern a consultant procurement.
OGS Plans Available directs bid questions for projects advertised on or after August 1, 2026 through Bid Express, with questions and responses published there and on the OGS site. Check the live project instructions for the designated channel, deadlines, addenda and binding communications. Do not treat an informal answer as a change to the documents without checking those instructions.
Make the submission requirements a separate register
Record the bid date and time, delivery method, bid form, security, required disclosures and addendum acknowledgments with an owner and evidence of completion. Confirm the project number and current document set. The security instrument and submission procedure are project-specific, so check the actual instructions and any later addendum before sending the bid.
| Item | Evidence to retain | Closing action |
|---|---|---|
| Question | Submission, date and affected drawing or specification | Track official response and deadline |
| Addendum | Issued document and acknowledgment requirement | Distribute to bidders and recalculate changes |
| Bid package | Form, security and delivery instructions | Independent final check against current documents |
In an illustrative OGS roof replacement, a question asks who disconnects rooftop equipment. An addendum assigns disconnect and reconnect to the electrical package. Send the revised scope to electrical and roofing bidders, check the quote revisions, remove any duplicate carry and record the resulting number. A response in the log without a quote and estimate decision leaves the risk unresolved. Use the broader addenda reconciliation process for the estimate trail.
Carry open requirements into delivery
Separate prebid questions from required construction submittals. A product approval requirement discovered during bid review may need both a bid allowance and a post-award submittal owner. Review public bid packaging only where the project's procurement structure makes it relevant.
Piper's Survey applies company questions to project documents, provides supported answers and flags items needing human response. The estimator still verifies agency instructions and off-document facts, and decides how an answer changes the carry.
Related reading
Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Construction submittals: build the register before procurement commitments
Build a submittal register from project requirements and connect review, procurement and installation dates to the cost and schedule assumptions in the bid.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.