Advancing Data Center Construction West 2027: utility questions for preconstruction
Take a utility gate worksheet to the Phoenix data center event and assign evidence, alternatives and repricing triggers.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
Take one unresolved utility assumption to Advancing Data Center Construction West and return with a verification owner and a date. The point is to turn a possible power or water alternative into a documented estimate basis, not to infer that any utility has committed service.
The organizer’s event page lists March 23–25, 2027 in Phoenix and identifies workshops on alternative power and water and market entry. Match the workshop to the assumption: an electrical preconstruction lead can assess a power dependency, while a mechanical or process lead can pursue the water boundary. Check the current organizer agenda and attendance terms before selecting a delegate. These questions are independent preparation, not a description of individual panels.
Build a utility gate grid
| Gate | Evidence and date to request | Temporary alternative to evaluate | Trigger to reopen estimate |
|---|---|---|---|
| Permanent power | Written project-specific service scope and anticipated availability | Temporary power basis, fuel, duration and connections | Capacity, energization date or responsibility changes |
| Water supply | Project-specific source, quantity, quality and availability evidence | Temporary supply or revised construction sequence | Source, volume, connection date or quality basis changes |
| Interface and approvals | Current drawings, owner responsibilities and applicable approval schedule | Alternate route or staged commissioning basis | Design or approval path changes |
The grid is an estimating tool, not evidence that any of those services or alternatives is available. Assign the owner’s utility contact or design lead to seek project-specific documentation. Record its revision and date; distinguish a discussion from a written commitment and the latter from an approved construction plan.
Price the alternative as a chain
In a hypothetical estimate, permanent power is assumed available for testing on a particular date. If that date is unconfirmed, a temporary-power carry may need equipment, connections, fuel, delivery, operation, removal and testing support. Identify who includes each item and the duration basis. A changed date can affect both the temporary system and commissioning sequence; check for duplication with trade bids before adding a GC allowance.
After the event, use the data center preconstruction checklist to assign the open interfaces. Set a date for utility evidence, the person responsible for obtaining it and the specific capacity or schedule change that triggers redesign and repricing.
Related reading
Before you carry a data center number: a precon checklist
Ten questions a GC precon team should answer before carrying a data center number: owner gear, redundancy, commissioning, liquid cooling, schedule and subs.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow