Pini Liberman on estimates grounded in the project documents
Pini Liberman, CEO of a $3B general contractor, on why strong pricing starts with knowing the project and how Piper keeps estimates tied to the documents.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Customer story
- Read
- 2 min
- Published
On this page
Pini Liberman is CEO of a $3B general contractor. This page records the account already published on the Piper homepage. It does not add metrics that were not in that quote.
Situation
In construction, strong pricing starts with knowing the project inside and out.
Before Piper
That required an impossible amount of manual review and still left room for blind spots.
What changed
Piper does the heavy review work, flags risks early, and gives the team confidence that estimates are grounded in the project documents.
Result
The published account is qualitative: helping win work while protecting margin. Piper has not published a numbered before-and-after for this team on this page.
Proof
In construction, strong pricing starts with knowing the project inside and out. Before Piper, that required an impossible amount of manual review and still left room for blind spots. Piper does the heavy review work, flags risks early, and gives us confidence that our estimates are grounded in the project documents, helping us win work while protecting margin.
Pini Liberman, CEO of a $3B General Contractor
See AI bid leveling and final bid review for the workflows behind that review.
For glazing estimates, grounding quantities in the project documents means keeping system area, glass types, window counts and sealant joints separate, then checking what revisions change before carrying quantities. The guide to building a custom AI glazing takeoff app in Piper covers those calculation rules, a test for equal areas with unequal perimeters, and a change register that catches revisions even when quantities stay unchanged.
Related reading
Construction bid leveling: a practical guide for GCs
How to level subcontractor bids across design-bid-build, CM-at-risk, design-build, and progressive design-build, and why the same spreadsheet does not work for all of them.

Final bid review: a QA/QC playbook for general contractors
The pre-submission gate between a working estimate and a price you are prepared to submit, explain, contract around, and build. Workflow, checklists, review lanes, delivery-method playbooks, and the KPIs worth tracking.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.