Piper vs. Procore, BuildingConnected and PlanHub for bid leveling
Bid management platforms get the bids in. Piper checks what is in them against the drawings and specs. Where each one fits in a GC's preconstruction workflow, and why most teams end up using both.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Comparison
- Read
- 3 min
- Published
On this page
Procore, BuildingConnected and PlanHub are bid management platforms: they help a general contractor invite subcontractors, collect bids and track coverage. Piper is an AI preconstruction system: it reads each bid against the drawings, specifications and addenda to show what the bid covers and what it leaves out. They overlap at the leveling sheet, and that overlap is where the choice gets confusing.
This page describes each product only by what its maker says it does, and links to the source.
Side by side
| Question | Bid management platforms | Piper |
|---|---|---|
| Main job | Run the bid: invite subs, distribute documents, collect bids, track coverage | Understand the bid: check each proposal against the project documents |
| What a bid is compared to | Other bids, line by line | The drawings, specifications, addenda and your company's scope standards |
| Silent exclusions (items a sub never mentions) | Depends on the bid form your team set up | Flagged, with the document line that requires the item |
| Traceability | Bid documents stored with the project | Every finding linked to the clause or sheet it came from |
| When the documents change | Re-issue to bidders | Shows which scopes and findings the change affects |
| Sub network and invitations | Core strength | Not a feature; keep using your platform |
| Output | Leveling view inside the platform | Export to the workbook your team already reviews |
What the platforms say they do
- Procore Bid Management lets teams "distribute information, collect bids, and track coverage all in one place" (Procore).
- BuildingConnected (Autodesk) is preconstruction software that "streamlines bid and risk management" with what Autodesk calls the largest network of construction professionals (BuildingConnected).
- PlanHub is a construction bidding platform with bid management software for finding projects and managing bids (PlanHub).
All three are strong at the part of preconstruction that is about people and logistics: who was invited, who responded, which trades are covered, and what each sub priced.
What Piper does
Piper reads subcontractor proposals against the drawings, specifications, addenda, and your company's scope standards. It flags exclusions, qualifications and silent items, and links each one to the clause behind it, so a reviewer can check a finding without re-deriving it. The leveling then exports to the workbook your team already uses for the bid meeting.
The same project understanding feeds scope generation before bids go out and final bid review before you submit, so a gap found at leveling is a gap you can trace back to the scope you sent.
How teams use them together
- Solicit and collect in your platform. Nothing about that changes.
- Bring the proposals into Piper with the project documents.
- Level against the scope. Review the gaps Piper found, each with its source.
- Decide and carry in your workbook. The bid meeting runs on the sheet your team trusts.
Which one do you need?
- Only a platform if your packages are simple, scopes rarely change after invite, and your pain is coverage and follow-up.
- Only Piper is rare: you still need a way to invite and collect bids, and email plus a shared folder is a platform too.
- Both if your losses come from scope a sub never priced: multi-trade packages, boundaries between trades, or addenda that land after bids go out.
For a wider look at the category, including spreadsheets, see the best bid leveling software for general contractors.
Where Piper fits
Piper does not replace your bid management platform. It answers the question the platform is not built to answer: does each bid actually cover the work in the documents? See it on the bid leveling page.
FAQ
Is Piper an alternative to Procore or BuildingConnected?
Not for running the bid. Piper does not send invitations or manage a sub network. It is an alternative to leveling bids in a spreadsheet: it checks each proposal against the drawings and specs and links every gap to its source.
Can Procore or BuildingConnected find scope gaps in a sub bid?
Their makers describe them as bid management tools: inviting subs, collecting bids and tracking coverage. Piper's approach is different: it reads the drawings and specs directly and checks each bid against them, so a gap the sub never mentions is still found.
Do I need to change my bid management platform to use Piper?
No. Keep collecting bids where you do today, and bring the proposals and project documents into Piper for leveling.
Where this fits in Piper
Bid Leveling
Compare subcontractor bids against the intended scope so the low number does not hide an expensive gap.
Related reading
Best bid leveling software for general contractors (2026)
Bid leveling tools fall into three groups, and they answer different questions. How bid management platforms, spreadsheets and scope-based AI leveling compare, and how to pick for your packages.

Bid leveling: spreadsheets vs. dedicated software
Excel is free, familiar, and infinitely flexible. Dedicated leveling software is faster and auditable but costs money and habits. Where the line actually falls, and how to tell which side of it you are on.

Construction bid leveling: a practical guide for GCs
How to level subcontractor bids across design-bid-build, CM-at-risk, design-build, and progressive design-build, and why the same spreadsheet does not work for all of them.

Construction bid solicitation: a practical guide for GCs
How general contractors plan bid packages, qualify subcontractors, manage ITBs and addenda, protect coverage, and receive proposals that can actually be leveled.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.