Steamboat Square Phase II: separate financing, work phases and occupied-site scope
Distinguish Steamboat Square's campus and implementation phases before pricing preservation, new homes and occupied-site work.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 3 min
- Published
On this page
A GC evaluating Steamboat Square Phase II should first identify the buildings and the package being priced. The Albany Housing Authority (AHA) describes campus Phase II as 200, 220 and 230 Green Street and 44 townhomes, but also describes that project as being in Phase I of III. Those are different phase labels. Neither the financing close nor the phase label supplies a trade scope or a current invitation to bid.
The AHA 2026 final draft annual plan separately identifies campus Phase I at 20 Rensselaer Street, with permanent conversion completed in November 2025. Its adjacent Phase II paragraph identifies the Green Street buildings and townhomes and an October 2025 RAD and 4% LIHTC transaction close. Keep those milestones on separate lines in a pursuit record, even though the draft PDF runs the paragraphs together.
What the plan confirms and what it leaves open
The approved 2026 annual plan, printed June 3, says the Phase II financing transaction closed in October 2025, the project was in Phase I of III, and full completion was anticipated in December 2029. These are plan statements as of that document, not a current site inspection or proof that every physical phase has started.
The earlier final draft describes 343 homes including 43 new homes, and says architectural upgrades and exterior retrofits were in design. That description helps identify the project but does not establish a current drawing revision, quantities or individual trade packages. The state's December 2025 financing announcement describes $159 million in financing for the Phase II development and preservation plus new construction. Financing is not a GC bid value, an awarded construction contract or a per-unit rehabilitation price.
Separate preservation from new construction
The 343-home figure combines existing-home preservation and 43 new homes. It should not be used as a single unit multiplier for every trade. For existing buildings, the estimator needs building-specific drawings and condition information to understand retained assemblies, selective removal, retrofit interfaces and access. For new homes, the team needs the issued site and building scope, including utility and tie-in limits. The annual plan does not provide those quantities.
A package might cross both categories, but that needs confirmation. For example, an electrical proposal could cover work inside occupied buildings, site distribution and new construction, or only one of those. Ask the issuer to define the boundary and list each included building and phase. A trade quote is useful only when its scope can be compared to that defined package; test coverage against a defined package before counting bids as coverage.
Phase and package identity register
This filled register keeps source milestones distinct from the next documents an estimator needs. The final column is an information request, not a statement that an issued package exists.
| Campus phase and building | Source as of | Financing or conversion milestone | Physical scope established | Next issued package needed |
|---|---|---|---|---|
| Phase I: 20 Rensselaer Street | 2026 final draft annual plan | Permanent conversion completed November 2025 | This milestone does not define Phase II trade work | Separate current package if pursuing work at this address |
| Phase II: 200, 220 and 230 Green Street and 44 townhomes | 2026 final draft annual plan | RAD and 4% LIHTC transaction closed October 2025 | 343 total homes including 43 new; upgrades and exterior retrofits described in design | Current building-by-building drawings, specifications and package limits |
| Phase II implementation: Phase I of III | Approved plan printed June 3, 2026 | Same October 2025 Phase II close | Full completion anticipated December 2029; no trade quantities established | Current phase map, work sequence and addenda |
Do not transfer a system or scope associated with 20 Rensselaer to the other buildings without a current project-specific document. Likewise, a contract for separately named Steamboat Historic work does not establish coverage of this Phase II development.
Before committing a construction price
Request the current phasing drawings and a building and unit schedule tied to the proposed package. For each work period, ask who controls unit access, whether temporary services are needed, and who owns any relocation arrangements. These are pricing questions, not a claim that relocation is occurring. Confirm work windows, areas available to each trade, turnover conditions and any repeated protection or setup on the issued documents.
Then obtain the actual bid invitation, scope divisions, drawings, specifications and all addenda. Map preservation and new construction to the relevant bidders, and log exclusions and assumptions by building and implementation phase. If no package is issued or the boundaries remain unresolved, retain a qualified pursuit estimate instead of treating the public financing announcement as an executable construction basis.
Related reading
Construction bid coverage: how GCs know every scope is covered
Ensure every trade has competitive bids before you lock the estimate. Track coverage with a matrix, follow up on invitations, and fill gaps so thin packages do not become expensive buyouts.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow