Subcontractor default insurance: review enrollment and retained obligations before award
Check project enrollment, package inclusion, qualification, retained costs and notice obligations under the actual subcontractor default insurance program.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
Before award, confirm project enrollment and how the actual subcontractor default insurance (SDI) program includes the proposed subcontract package. A signed subcontract or a general statement that the GC has SDI does not establish that the actual program includes this package. The GC also needs to understand its retained costs, administration and notice obligations.
AXA XL's SDI product description describes insurance addressing an insured GC or CM's economic losses from subcontractor performance default and discusses project enrollment and prequalification. That is one provider's product description, not evidence of a particular project's acceptance. Actual coverage and reimbursement depend on the issued policy and facts.
Connect buyout to program administration
| Control | Preaward record |
|---|---|
| Program and project | Policy period, eligible project and risk-management contact |
| Package inclusion under the actual program | Subcontracting entity, package, value and the program owner’s confirmation of applicable inclusion |
| Qualification | Required financial and operational review, decision and open conditions |
| Retained costs | Applicable retention, deductible and other program obligations for adviser review |
| Notice and evidence | Policy and subcontract triggers, recipients and records owner |
| Award decision | Approval, outstanding conditions and separate bond obligations |
Assume this fictional GC's program requires administrator confirmation of included subcontract packages. In the buyout, the trade is qualified and its subcontract is ready, but the project administrator has not recorded the package under the program. The award team should obtain written confirmation under that program or an explicit risk-management decision on the gap before treating the package as insured. If the subcontract value or scope changes, route the change back to the program owner.
The provider's notice and reporting guide explains how policy and subcontract wording can affect default and notice timing. It describes that provider's process, not a universal deadline. Have counsel and risk management review the actual documents before any default action.
Check required bonds separately. SDI should not be assumed to replace a statutory or prime-contract bond. Likewise, trade qualification does not prove the proposal includes every required scope item. Preserve the enrollment evidence, qualification decision, retained-cost treatment and notice owner in the buyout record.
Related reading
Performance bonds, payment bonds and bid bonds: review the obligation before the bid
Bid, payment and performance bonds serve different purposes. A GC review for matching bond forms, project obligations, surety capacity and the estimate basis.

Subcontractor prequalification vs. bid review: company suitability does not settle scope coverage
Prequalification and bid review answer different questions. A method for keeping suitability, project eligibility, quote coverage and carry approval distinct.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.