World of Concrete 2027: what a GC estimator should plan around
World of Concrete 2027 runs Jan. 18–21 in Las Vegas. Prices before the Dec. 11 deadline, and how GC precon teams use it to level concrete bids better.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 5 min
- Published
On this page
World of Concrete 2027 takes place at the Las Vegas Convention Center, with education sessions from Monday, Jan. 18 through Thursday, Jan. 21, and the exhibit floor open Jan. 19–21. Registration is open. The cheapest way in, an Exhibits-Only badge, is $115 until Dec. 11, 2026 and $145 after.
The organizer describes it as the industry's annual international event for concrete and masonry professionals. That is the right frame for a general contractor. It is not a general-contractor conference and it will not teach you estimating. Its value to a GC's precon team is narrower and very practical: a few days with the people and products behind your concrete, masonry and tilt-up scopes, which are among the packages where sub proposals differ most in what they include.
Facts below come from the official World of Concrete site, its pricing and hours page, registration page, education page and travel pages, checked Nov. 23, 2026.
Dates, hours and venue
| Day | Education | Exhibits |
|---|---|---|
| Sun. Jan. 17 | Registration desk 12:00–5:00 PM | Closed |
| Mon. Jan. 18 | 8:00 AM–5:00 PM (pre-show education day) | Closed |
| Tue. Jan. 19 | 8:00 AM–5:00 PM | 9:00 AM–5:00 PM |
| Wed. Jan. 20 | 8:00 AM–5:00 PM | 9:00 AM–5:00 PM |
| Thu. Jan. 21 | 8:00 AM–3:00 PM | 9:00 AM–3:00 PM |
The venue is the Las Vegas Convention Center, 3150 Paradise Road, using the North, Central and South Halls plus outdoor lots. Three-hour seminars generally run 8:00 to 11:00 AM; 90-minute seminars at 8:30 AM and 1:30 PM. That means a full education day and a serious walk of the exhibit floor compete for the same hours. Decide in advance which you are there for.
What it costs
Prices below are the organizer's published rates. Most rise after Dec. 11, 2026.
| Registration | Through Dec. 11, 2026 | After Dec. 11, 2026 |
|---|---|---|
| Exhibits-Only | $115 | $145 |
| 90-minute seminar | $135 | $165 |
| 3-hour seminar | $215 | $245 |
| Super Pass, Leadership Development (9 seminar hours) | $500 | $575 |
| Super Pass, Focused Learning (12 seminar hours) | $620 | $725 |
| Super Pass, Open Learning (12 seminar hours) | $725 | $830 |
The organizer notes that fees vary by business type and date, so the price you are offered can differ. Two points on the official pages conflict: the registration page says there is no onsite registration, but the pricing page lists a $165 onsite Exhibits-Only rate. Register online before you travel and do not count on buying at the door. Seminar cancellations carry a $75 fee through Dec. 11, and there are no refunds after that date.
What is on the education program
The organizer lists more than 175 sessions with 65 new topics for 2027, across technical applications, business practices, project management and safety. New formats include an AI luncheon and forum on integrating AI into field practices and "Connect with the Experts" roundtables of up to nine people per table. A featured engineering topic, "Constructable Slabs-on-Ground," is listed for 2027.
We could not read individual session titles from the session catalog when we checked, so we are not listing specific estimating or bidding sessions here. Search the catalog and the official app for "estimating," "bidding," "slab," "tilt-up" and "masonry" before you buy seminars.
Continuing education: the organizer lists AIA CES learning units submitted for most seminar formats, PDH self-reporting for engineers and approvals from the Mason Contractors Association of America and the Tilt-Up Concrete Association for select sessions. Certificates require a badge scan and session evaluation.
Who should go from a GC, and why
Send the person who levels your concrete, masonry and tilt-up bids, not just the person who manages vendor relationships.
Concrete packages are where a GC's scope sheet and a sub's proposal most often describe different jobs. Common friction points include who carries vapor retarders and underslab insulation, slab flatness and levelness requirements, curing and protection in cold weather, embeds and anchor bolts, reinforcing detailing and placement, pump and hoisting access, and testing. Each one is a place where two sub numbers look comparable and are not. Our guides on reviewing subcontractor exclusions and qualifications and bid leveling cover how to normalize those differences.
A trade show is a good place to get those questions answered by the people who build it. Before you fly, pull the open scope questions from your current concrete bids and the exclusions that keep coming back. Take that list to the floor and to the roundtables. You come home with a better scope sheet for the next package, not just a bag of brochures.
Field and operations staff will get more out of the equipment halls and hands-on training. If your company sends both, give the estimator a separate agenda.
Practical tips
- Register before Dec. 11, 2026. Exhibits-Only and seminar prices rise after that date.
- Book housing through onPeak, the organizer's only endorsed housing provider. The organizer warns about unauthorized hotel solicitors. Booking through onPeak also includes the free shuttle to the convention center for non-walking-distance hotels; otherwise a shuttle pass is $70 (or $80 after Dec. 11).
- Do not plan to park at the convention center. The organizer describes parking there as extremely limited, cashless and not guaranteed.
- Bring government photo ID for badge pickup.
- Download the official app (search "World of Concrete"). Seminar handouts are digital only.
- Next year: the organizer lists World of Concrete 2028 for Jan. 25–27, 2028, with education starting Jan. 24.
Where Piper fits in concrete bid review
The questions you bring back from the show are scope questions: what is included in a concrete sub's number, and what is assumed. They are only useful if they become part of how the next package is written and how the next set of proposals is compared.
Piper is an AI operating system for preconstruction that keeps one evolving understanding of each project and of your company's own standards. It can generate a trade scope for a concrete package from the drawings and specifications, with your company's boundaries applied, then use the same scope to level concrete bids and flag where a proposal excludes or qualifies something the scope expects. It also does quantity takeoff on drawings, measuring areas, lengths and counts, so slab areas and wall lengths can be checked against what subs are carrying. The estimator decides what to carry. The demo request at the bottom of this page shows it on a real package.
FAQ
When is World of Concrete 2027?
Education runs Jan. 18–21, 2027 and the exhibit floor is open Jan. 19–21, 2027, at the Las Vegas Convention Center, according to the organizer.
How much is World of Concrete 2027 registration?
Exhibits-Only is $115 through Dec. 11, 2026 and $145 after. Seminars and Super Passes are priced separately, from $135 for a 90-minute seminar up to $830 for an Open Learning Super Pass after Dec. 11. The organizer notes fees vary by business type and date.
Can I register onsite?
The official pages conflict. The registration page says there is no onsite registration, while the pricing page lists an onsite rate. Register online in advance.
Is World of Concrete useful for general contractors?
It is a concrete and masonry show. For GC estimators and precon teams, its value is trade-specific knowledge that improves concrete, masonry and tilt-up scopes and bid leveling.
Where this fits in Piper
Scope Generation
Turn drawings, specifications, addenda, and company standards into source-backed trade scopes.
Bid Leveling
Compare subcontractor bids against the intended scope so the low number does not hide an expensive gap.
Takeoff
Measure areas, lengths, and counts manually, with assistance, or through an agent. Keep the measurements editable and on the drawings behind them.
Related reading
Construction conferences for preconstruction teams, December 2026 to April 2027
Ten construction conferences from December 2026 to April 2027, compared for GC estimators and precon leaders by date, city, cost and who on the team should go.

Construction bid leveling: a practical guide for GCs
How to level subcontractor bids across design-bid-build, CM-at-risk, design-build, and progressive design-build, and why the same spreadsheet does not work for all of them.

How to review subcontractor exclusions and qualifications
Subcontractor bids bury risk in exclusions and qualifications. Identify them, classify impact, normalize the comparison, and lock decisions into the subcontract scope letter before award.

Construction takeoff vs. estimating: a measured quantity is one input to the price
Quantity takeoff and construction estimating produce different outputs. Review connecting measured work, specifications, trade scope, cost and assumptions.

Who Owns Firestopping? Common Scope Boundary Problems
Firestopping fights rarely start with the UL listing. They start when the bid left the interface unowned. An ownership map, the gray zones that blow up awards, and what precon should freeze first.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.