Country Club Creek wastewater: separate utility, drainage and trail scope
Review Country Club Creek utility, drainage and trail boundaries, preserving differences between the owner overview and the dated engineering-services scope.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
For a civil GC evaluating Country Club Creek, build the estimate around physical limits and agency interfaces, not a single assumed utility package. The city describes water and wastewater improvements alongside drainage and two distinct trail components. The public overview does not establish how construction contracts will be divided.
What the owner describes
Austin Water’s project page describes planning along Country Club Creek between Metcalfe Road and Oltorf Street, with construction anticipated within the next few years rather than on a firm date. It identifies 5,000 linear feet of new wastewater pipe, 480 feet of replacement water line and 500 feet of new water line. City partners describe creek stabilization and detention, 1,100 feet of parks trail, and a separate 550-foot lit Safe Routes to School trail. These lengths describe different work, not an established single-contract takeoff.
The city’s March 2025 engineering-services recommendation describes a different water-line summary and adds a 600-foot concrete trail alongside the greenbelt and school-route trails. Keep those observations separate from the current overview; neither summary establishes the final construction package. Ask for the latest water limits and a crosswalk of all trail components before combining quantities or treating an omitted item as deleted.
Create a shared physical-limit register
This table is a preconstruction review tool. The questions are not established contract obligations or assignments.
| City program or work | Publicly described scope | Questions to resolve in issued documents |
|---|---|---|
| Austin Water | Wastewater and water line replacement or extension | Where are tie-ins, bypass limits, testing and restoration, and who carries each? |
| Watershed Protection | Creek stabilization and detention between Metcalfe and Burleson | Where do earthwork and grading overlap utility access, and who restores disturbed stabilization? |
| Parks and Recreation | Greenbelt trail between Burleson and Metcalfe | What are trail limits, surface, subgrade and acceptance boundaries? |
| Transportation and Public Works Safe Routes to School | Lit concrete trail toward Linder Elementary | Who carries lighting power, crossings, path connections and acceptance? |
Plot each limit on the same current plan, including temporary access and the final surface. A utility trench crossing a future path is an example of a possible overlap, not an identified project condition. Ask whether utility restoration stops at rough grade or includes the finished path, and whether the path contractor accepts that substrate. Record both bidders’ answers and a priced resolution before carry.
Request the documents that settle the boundary
Obtain the actual solicitation, drawings, specifications, schedule, permits, addenda and agency coordination documents for the package being priced. Check temporary creek protection, access, dewatering, existing utilities, testing and sequencing against those documents. Identify who controls approvals and who bears restoration after a later trade disturbs completed work. If a scope is outside the package, record the external predecessor and its assumed completion date instead of quietly pricing it as included.
Use the plumbing and underground boundary guide for comparing tie-in descriptions and exclusions. Recheck the city’s current project and procurement information before making a pursuit decision.
Related reading
The five-foot line: plumbing and site utilities
Review plumbing and site-utility endpoints, connections, excavation and fees against actual project requirements before assigning scope or carrying a price.

Construction logistics plans: turn access and storage assumptions into priced scope
A site logistics drawing is useful when its assumptions reach the estimate. Review access, storage, deliveries, handling and repeated moves before pricing.

How to spot scope gaps before you carry the number
A practical review sequence for finding missing scope, duplicated cost, and unresolved trade boundaries while there is still time to price them properly.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.