BE-Ex Buildings as Grid Assets 2026: separate controls scope from demand-response enrollment
Assign controls, metering, verification and operating handoffs before relying on a demand-response strategy in a construction estimate.

Resources
Guides, research and playbooks for general contractors' preconstruction and estimating teams working through takeoff, scope, bids, risk, project documents and final review.
Browse guides and practical preconstruction playbooks.
Search resourcesAssign controls, metering, verification and operating handoffs before relying on a demand-response strategy in a construction estimate.

Review BATWorks' planned lab and prototype hub through base-building, specialist fitout and operator acceptance responsibilities.

Separate the Battery wharf rebuild from adjacent resilience work and price ferry access, marine handling and park restoration by phase.

A segment-by-segment review of Canarsie sewer, grading and frontage interfaces in the June 2026 preliminary design.

Distinguish Austin service availability, capacity review and extensions, then allocate taps, meters and street restoration between utility bids.

Assign utility tie-in, shutout, inspection and acceptance work across the site and building packages on Austin commercial development.

Connect Austin right-of-way permit types, contractor requirements and occupied space and duration to the bid logistics plan.

Connect Austin subcontractor substitutions and changed scope to prior compliance-plan approval, participation calculations and payment records.

Work backward from Austin’s ten-business-day MBE/WBE outreach rule and reconcile certified scopes, base-bid commitments and response evidence.

Review Austin Light Rail Phase 1 across transitway, utilities, stations and rail systems, with explicit prerequisites for equipment installation and integrated testing.

Choose Austin’s diversion or disposal-intensity route, reconcile hauling records and assign the recycling report before final inspection.

Choose assisted or agentic takeoff by how you can verify the work. Compare candidate review, coverage checks and delegation limits before carrying quantities.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.