Loft Law IMD work: identify the legalization basis before carrying a conversion scope
Connect verified Loft Board status and the issued legalization design to fire protection, egress, occupied work and acceptance evidence.

Resources
Guides, research and playbooks for general contractors' preconstruction and estimating teams working through takeoff, scope, bids, risk, project documents and final review.
Browse guides and practical preconstruction playbooks.
Search resourcesConnect verified Loft Board status and the issued legalization design to fire protection, egress, occupied work and acceptance evidence.

Check AI utility quantities against network continuity, profiles, structure IDs and scope boundaries before carrying storm, sanitary or water work in the bid.

Level landmark window bids by opening, facade classification, historic profile, finish and approved repair or replacement detail.

Budget the full equipment and railing envelope, temporary mockup and review handoff before releasing landmark rooftop equipment.

Connect facade repair quantities to the approved substrate, mortar, preparation, testing and sample requirements at Manhattan landmarks.

Assign the sleeve, louver, opening, support, weather seal and restoration around an LPC-reviewed HVAC installation before buying equipment.

Include permanent channels, brackets and ground attachments in a landmark flood-barrier scope while coordinating the separate engineered flood strategy.

Compare the accessible route, historic entrance fabric, ramp or lift interfaces and approval basis before pricing a landmark entrance.

Level storm, sanitary and water bids in Piper against connection limits, depth assumptions and acceptance scope. Keep evidence beside the carry decision.

Review low voltage and fire alarm quantities by system, route and interface. Catch missing design scope, cable multipliers and trade gaps before bid day.

Measure demolition in Piper by removal keynote and disposition. Combine manual, assisted and agentic takeoff, then review source geometry and trade scope.

Check building status, district and covered work before treating an HPD Certificate of No Harassment as a resolved DOB approval dependency.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.